Implementation of Suppressed Demand Guidelines in SSC Methodologies

This workshop will discuss the implementation of the Suppressed Demand Guidelines in new and existing SSC methodologies. Topics covered include definitions, work program, prioritized methodologies, and stakeholder input.

rburgos
Télécharger la présentation

Implementation of Suppressed Demand Guidelines in SSC Methodologies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies FIRST SDM JOINT COORDINATION WORKSHOP, Maritim Hotel, Bonn, Germany 24 - 25 March 2012 Carolyn Luce, Small Scale Working Group Member

  2. OVERVIEW • A few definitions • SD Work Programme • Prioritized Methodologies • Request for Revisions/Approach • Further Stakeholder Input

  3. SD Guidelines – Scope and Applicability • Applicable when the minimum service level is not met, eg. For basic lighting, purified water, water treatment); • Provides methodological approaches for two issues: • The identification of the baseline measure under a suppressed demand situation; and • The identification of the baseline service level that should be used to calculate baseline emissions in a suppressed demand situation.

  4. Definitions from the Guidelines Minimum service level: The service level that is able to meet basic human needs (e.g. basic housing, basic energy services including lighting, cooking, drinking water supply) Income effect: Occurs when the demand for a service would increase over time in the baseline scenario as a result of an increase of income. Rebound effect: Occurs when the demand for a service would increase as a result of the decreased cost of the service per unit in the project scenario.

  5. Work programme on SD Guidelines (1) Existing Methodologies: • Scan methodologies to assess: • If suppressed demand has been already addressed • If suppressed demand is relevant; • Prioritize methodologies for revision, taking into account: • Pertinence of minimum service level • Priority sector • Potential for improving regional distribution of CDM • Usage rate of the methodology

  6. Work programme on SD Guidelines (2) • Define the minimum service level in methodologies - using international/national sources • Request input from DNAs, stakeholders and practitioners: a) Teleconferences; b) Call for public inputs, including comments on draft revisions; c) Dedicated methodology workshops. • Assessment of the draft revised methodologies by SSCWG..

  7. SSC Meths where SD is taken into account • AMS-I.A. Electricity generation by the user • AMS-I.D. Grid-connect reneable electricity generation • AMSI.E. Switch from non-renewable biomass for thermal applications by the user • AMS-I.K. Solar cookers for households • AMS-I.L . Electrification of rural communities using renewable energy • AMS-II.G. Energy efficiency measures in thermal applications of non-renewable biomass • AMS-III.AV. Low greenhouse gas emitting water purification systems

  8. SSC Meths prioritized for revision • AMS-I.A. Electricity generation by the user • AMSIII.AR Substituting fossil fuel based lighting with LED/CFL lighting systems • …

  9. Requests for Revisions • Requests for revisions of methodologies to take into account SD Guidelines are welcome: • Recently received requests for revisions include: • AMS-III.F Avoidance of methane emissions through composting • AMSIII.AR Substituting fossil fuel based lighting with LED/CFLlightingsystems • …

  10. Approach for baseline emission intensity • Identify various alternative measures available to the PPs that satisfy the same need as the need satisfied by the project activity; • Eliminate alternatives not in compliance with laws; • Rank the remaining in order of quality of the service provided; • Assess them in the sequence identified in step 3 and eliminate alternatives that faces barriers; • The first alternative not eliminated by step 4 is the baseline (needs to be updated regularly)

  11. Approach for baseline level of service Where the level of service of the project activity cannot be met with the baseline measure Baseline level of service = Minimum level of service The minimum service level is determined based on: (a) National/international peer reviewed research or relevant studies; (b) Benchmarks that take into account that emissions will rise to achieve the international/national development goals.

  12. Opportunities for Stakeholder Input - Proposed new methodologies - Request for revision of methodologies - Teleconferences; - Calls for public inputs, including comments on draft revisions; • Dedicated methodology workshops Your input is welcome …. Thank you