An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PT. KHARISMA KAHURIPANSITAC & CME PROJECT Jl.Kalibaru Timur No.1 Jakarta Utara Telp : 021-44833465Fax : 021-44833464 Jakarta 14270, INDONESIA Email : www.kharisma-kahuripan.com

  2. DAFTAR ISI • INFORMASI UMUM • VISI DAN MISI • SOP PROJECT SACME • STRUKTUR ORGANISASI PROJECT SACME SAAT INI • RENCANA STRUKTUR ORGANISASI PROJECT SACME • SITAC • CIVIL, MECHANICAL AND ELECTRICAL • Civil • Mechanical • Electrical

  3. Informasi umum • Di dalam bidang Telekomunikasi ini PT. Kharisma Kahuripan dipercayakan untuk menjalankan project SITAC dan CME oleh Salah Satu Operator Terbesar di Indonesia ini. Dan Prestasi yang dicapai adalah Baik. • Project SACME ini sudah dijalankan dibeberapa Regional yaitu : Jabotabek, Jateng, Jatim, Balinusra, Sumbagsel, Kalimantan, Sulawesi dan Papua. • Target dari Pekerjaan SACME ini adalah achieve ZERO-accident.

  4. Visi dan misi • Visi PROJECT DIVISION mempunyai strategi yang selalu konsisten untuk selalu dapat dipercaya oleh customer khususnya untuk bidang telekomunikasi yaitu SITAC dan CME menyelesaikan pekerjaan dengan target achievement yang diberikan oleh customer. . These characteristics together with our spirit and values assure us to provide complete solutions for network rollout by well defined services and deliverables. • isi PROJECT DIVISION selalu percaya diri untuk tetap eksis dalam bidang telekomunikasi khususnya SITAC dan CME Company values / NilaiUtamaPerusahaan : • Proactive and honest company environment. • • Continuous developing . • • Project and customer orientation.

  5. SOP PROJECT

  6. STRUKTUR ORGANISASI PROJECT SACME

  7. sitac SITAC = Site Acquisition Proses mulai dari Site hunting sampai dengan Site Opening dimana didalam proses tersebut termasuk pengurusan BAN-BAK, PKS, serta IMB dan HO sesuai dengan standarisasi area masing-masing.

  8. Civil, Mechanical and Electrical Civil Civil Yaitu pekerjaan pemasangan infrastruktur untuk BSC/BTS: Pondasi tower, permanent shelter, Pondasi shelter, Pemasangan/ Pendirian tower, pengecatan tower, instalasi grounding bar and earthing.

  9. CME

  10. Civil Project Kamuflase-TBG Yaitu pekerjaan pemasangan infrastruktur untuk : Struktur Tower/Monopole dan Pemasangan Kamuflase termasuk Mounting dan Pengecatan.

  11. Mechanical and Electrical Mechanical and Electrical Penyediaan dan pemasangan Mechanical and Electrical (ME) untuk BSC/BTS: AC power, Air Conditioner, Panel Distribution, Grounding, Alarm System misalnya untuk Heat detector, Smoke detector, DC exhaust fan.

  12. Mechanical and Electrical

  13. Installation, Dismantle, Relokasi dan Quality Audit • Instalasi Tower BTS • Site Quality Audit • Pembongkaran Perangkat (Equipment Dismantling) • Pemindahan Perangkat ke lokasi yang baru (Equipment Relocation)

  14. PENGALAMAN PROJECT Proyek SACME PT. Mitratel • RO JATIM • RO BALINUSRA • RO SULMAPUA • RO TIMOR LESTE

  15. PENGALAMAN PROJECT Proyek Kamuflase PT. Tower Bersama • RO SUMBAGSEL • RO JABOTABEK • RO KALIMANTAN • RO JATIM

  16. TE-0514P124 CME 3 SITES AREA JATENG - DMT_PL Project.xls

  17. TE-0114P023 SIS SITAC DMT JATENG 10 SITE_Rev1_PL Project.xls