html5-img
1 / 5

BI/ ML:Complexe PS LS1: ready

BI/ ML:Complexe PS LS1: ready. BI/ ML:Complexe PS LS1: still need work or coordination with other sections (1/2). BI/ ML:Complexe PS LS1: still need work or coordination with other sections (2/2). Problèmes potentiels.

rey
Télécharger la présentation

BI/ ML:Complexe PS LS1: ready

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BI/ML:Complexe PS LS1: ready TB BE/BI LS1 Complexe PS: ML section

  2. BI/ML:Complexe PS LS1:still need work or coordination with other sections (1/2) TB BE/BI LS1 Complexe PS: ML section

  3. BI/ML:Complexe PS LS1:still need work or coordination with other sections (2/2) TB BE/BI LS1 Complexe PS: ML section

  4. Problèmes potentiels • Obtention de l’étanchéité et passage test dégazage (concerne pick-up UES, sem-grid SS52, pick-up UMA) • FWS Booster: obtention de la calibration • Moyen humain (boite à filtre, AD base, remplacement distribution pneumatique de 3 système MTV, rénovation pneumatique sem-grid…) TB BE/BI LS1 Complexe PS: ML section

  5. Améliorations • Recherche de solutions pour être plus efficace pour l’obtention de l’étanchéité • Documentations, plans disponibles • Pièces de réserve disponibles TB BE/BI LS1 Complexe PS: ML section

More Related