An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS COMITATO NAZIONALE ITALIANO 41ma Sessione Generale Cigre Parigi, 27 agosto – 1 settembre 2006 Comitato di studio A2 Trasformatori GáborGurszky Membro italiano Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  2. Sintesi inerente la Sessione Tecnica del comitato di studio A2 • Osservazioni generali • Reliability has a primary importance • Managing the transformer’s conditions efficiently and safely • Minimizing costs • Extending service life • Identifying and evaluating risks • Avoiding unplanned outages Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  3. Sintesi inerente la Sessione Tecnica del comitato di studio A2 • Soggetto preferenziale 1: Tranformers reliability, technical, economical and strategic aspects • Specification and Manufacture • Diagnostic monitoring and assessment in service • Reliability of major components (bushings and TC-s) • Repair and refurbishment options • New threats to reliability – CORROSIVE SULPHUR • New technology • Reliability surveys Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  4. Sintesi inerente la Sessione Tecnica del comitato di studio A2 • Soggetto preferenziale 2: Phase Shifter Transformer • Large Quadrature Booster Transformers • Phase Shifting Transformers and Auto transformers • Selection of OLTCs dor application in PSTs • Innovative applications of PSTs • Variable Frequency Transformers (VFT) for phase shifting Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  5. Sintesi inerente la Sessione Tecnica del comitato di studio A2 • Soggetto preferenziale 3: Effect of Electrical Transients on Transformer Performance • Collaboration between equipment user and manufacturer to avoid detrimental effects • Modeling of Fast Front Transient • Life expectancy of ZnO varistor • Failure from remote energisation • Repetitive Failures – Lightning Impulses Natural Resonance of Winding Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  6. Riunione del comitato di studio A2 • Nuovi gruppi di lavoro costituiti e nuove attività • The creation of four new working bodies was mentioned: • Fire Safety • Guide for Maintenance • Experience in service with new liquids • Reliability aspects of transformers Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  7. Comitato di studio A2: soggetti preferenziali per il 2008 • PS 1: Performance in service on new insulation systems for transformers: • Thermal, electrical and environmental performances • Fire safety • Condition assesment: gas in oil analysis; oil tests Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  8. Comitato di studio A2: soggetti preferenziali per il 2008 • PS2: Reliability / Risk assessment of tr.s in service • Purchasing vs Refurbishment; Technical-economical analysis; Reliability and testing; Technical improvements on aged units, • Diagnostics, post-mortem post scraping investigations, on-line monitoring, moisture assessment, drying, on-line degassers and dehumidifiers • Oil corrosivity and mitigation technique, reinhibiting, metal passivators Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006

  9. Comitato di studio A2: soggetti preferenziali per il 2008 • PS 3: Reactors (shunt, shunt with regulation, series, neutral) and related items • Impact of specification, noise, vibrations • Loading, switching operations, experiences in service, system aspects, new applications and designs • Reliability, condition assessment, end of life Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006