1 / 13

Olympic and Paralympic Games 2012 Are you prepared?

Olympic and Paralympic Games 2012 Are you prepared?. Torch Relay through Kent:. Torch relay with torch bearers through 33 communities Torch in convoy mode between communities Short or minimal road closures in communities Convoy travels at least 10mph less than speed limit

rivka
Télécharger la présentation

Olympic and Paralympic Games 2012 Are you prepared?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Olympic and Paralympic Games 2012Are you prepared?

  2. Torch Relay through Kent: • Torch relay with torch bearers through 33 communities • Torch in convoy mode between communities • Short or minimal road closuresin communities • Convoy travels at least 10mphless than speed limit • Presenting Partner advance activation 20 – 60 minutes ahead of the convoy

  3. Olympics27 July – 12 August – biggest sporting event in the world (9 m tickets) Paralympics 29 August – 9 September – 3rd biggest sporting event in the world (2 m tickets) For Olympics: • Estimated 28% of tickets from the South of the UK (approx 150,000 per day) • Overall estimate of people in Kent at busiest 24 hour periods of the Olympic Games is 200,000+ (resident population in Kent and Medway is 1.7 million)

  4. Ticketed spectators from Europe - mode of travel (Olympics)All Europe Near Mainland Europe > 265,000 Sports tourists – (non-ticketed) expected to be up to 200,000 From 2012 Transport Presentation, Bayo Dosunmu, Head of Transport Planning

  5. Transport to Venues • Ebbsfleet9 ½ minutes to Olympic Park (official London 2012 Park and Rail service, up to 14,000 passengers every hour) • Extended peak and longer operating hours: Morning peak 7:30 -10:00, afternoon 17:00 – 19:00, evening peak 20:00-23:00 • Discouraging car travel to venues (except blue badge) • 80% will travel by rail • 2012 Games coach services • Port of Dover and Channel Tunnel at capacity • Strategic and local Park-&-Ridesites

  6. What does this mean for Kent? • All Hotel, B&B, Guest Houses, camping and caravanning sites will be full • Different timetables for trains and, in some areas, buses • Much more traffic – rail and roads will be very busy • Getting around will take longer • Supply chain may be affected

  7. Paralympics Ticketed spectators from Europe • 60,000 tickets to overseas spectators • 95% of overseas spectators from Europe • France, Netherlands, Germany, Belgium account for almost 70% of all overseas spectators • Peak overseas arrivals 3,500 spectators onDay 2 & 3 • Larger groups (schools and special needs groups) • Increased wheelchair seating capacity at venues

  8. Paralympic road cycling at Brands Hatch/ West Kingsdown 3-8 Sept.(+ training day on 19 June) • Road closures: A20 near entrance to Brands Hatch to Scratchers Lane, Scratchers Lane and Fawkham Road closed • Extensive diversion viaA25, A225 • Local access toWest Kingsdown and local traffic management • All local businesses informed • Leaflet to residents w/c 21 May

  9. Way forward – prepare from NOWfor business as usual and higher demand • Ensure adequate staff cover throughout • Ensure most vulnerable clients identified • Know about the expected impact on traffic and transport – everything will take longer • Ensure all staff are aware of contingency plans • Consider buddy arrangements for service delivery if necessary • Adjust staff rotas if necessary • Ensure supply chain resilience • Keep Olympics resilience on the agenda

  10. Communication of information • So far:- January 2012: business continuity advice and checklist- March 2012:Torch route street level detail and wider information • Way forward: - disseminate further information when available (e.g. access to West Kingsdown) • Ensure your contact details on Kent Care Directory are up to date and emails regularly checked • Feed back any concerns

  11. Be aware of events in neighbouring Counties or London Boroughs – they may impact on Kent- North Greenwich Arena- Greenwich Park- Royal Artillery Barracks, Woolwich • Look at local papers and listen to local media for information on local celebrations and events and up to date newsand traffic

  12. Useful websites:www.london2012.comhttp://www.london2012.com/olympic-torch-relay-maphttp://www.london2012.com/documents/venue-documents/brands-hatch-route-map.pdfwww.kent.gov.ukwww.kentsport.org/london2012/for news, Kent events calendar, sport and training camps, tourism and transport, business continuitywww.getaheadofthegames.com/for travel information

More Related