1 / 2

Empirical Project

Empirical Project. Title: Interest Rates and Economic Growth Step 1: Read and understand the paper: “An Empirical Comparison of Alternative Models of Short-Term Interest Rates” by Chan, Karoly, Longstafff and Sanders, Journal of Finance (no 3, 1992).

rocio
Télécharger la présentation

Empirical Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Empirical Project Title: Interest Rates and Economic Growth • Step 1:Read and understandthe paper: “An Empirical Comparison of Alternative Models of Short-Term Interest Rates” by Chan, Karoly, Longstafff and Sanders, Journal of Finance (no 3, 1992). • Step 2: Get an empirical paper on interest rates and economic growth. A paper that relates interest rates at different maturities with some measure of economic growth in different countries. • Step 3: Try to replicate that paper. To do that you have to get the data, for instance from the data-base ECOWIN (25-04-07 you should handle in a piece of paper with the title of the paper you are going to replicate, a brief description of your empirical project, and a description of the data you will be using) • Step 4: Find the best univariate model for the two variables of step 2, having in mind the paper of step 1 and a forecasting criteria (10-05-07 you should handel a piece of paper showing the best univariate model you have obtained). • Step 5: Construct the best corresponding bivariate VAR model and the IRFs derived from it. • Step 6: Analyze Granger-causality, as well as cointegration. If possible carry on the Gonzalo-Granger permanent and transitory decomposition of both variables. • Step 7: Conclusions. You must handle in the project (No More than 3 pages) the day of the final exam. Remember that Science is Summary.

  2. Some Hints • Use JSTOR • Use the NBER working papers data-base • Use Google and Google-Scholar • See the book by Kerry Patterson (200): “An introduction to Applied Econometrics, a time series approach”

More Related