190 likes | 346 Vues
Quebec Interop 06 Tutorial Change Order Management Torsten Ihrig Heidelberger Druckmaschinen AG. Overview. Scenario What is Change Order Management Example What is possible with JDF Job resend Specific Change Summary What is possible with Prinect. Scenario. MIS.
E N D
Quebec Interop 06 TutorialChange Order ManagementTorsten IhrigHeidelberger Druckmaschinen AG
Overview • Scenario • What is Change Order Management • Example • What is possible with JDF • Job resend • Specific Change • Summary • What is possible with Prinect
Scenario MIS Production Controller ( Preset, Scheduling, ..) Cutter Folder Proofer PlateSetter Press PrePress Press PostPress
What is Change Order Management Changes made to the job after submitting the JDF from the MIS to Production • Changes to the job made in the MIS .. initiated from the customer... initiated from the operator. • Changes made in Production.. because the planned Device is not available... Initiated from the customer by sending different content. • Changes made at the device by the operator (post facto).
Example • MIS creates the Job based on the specifications of the customer “Saddlestitched Brochure A4 with 4p/4c Cover, 16p/4c Body” • The Production Job is sent to the Production Controller • Production Controller starts processing the Job (Expanding GrayBoxes, Submitting Processes to Devices) • Customer initiates change to his job through his CSR:“2500 Copies instead of 2000” • Customer initiates change by sending the content for the cover pages with two additional Spotcolors.
Changes from MIS Production MIS resends the Job
Job resend ResubmitQueueEntry • Only valid as long as the Job in the Queue is “Held” or “Waiting” Job not started in Production • There is no information for the Production Controller what has been changed. • All preset is lost.
Job resend AbortQueueEntry/SubmitQueueEntry • Necessary when Job started in Production. • Before the “AbortQueueEntry” can be returned all running processes have to be aborted. • If only the Amount should be changed the running Body-Sheet on the press has to be aborted and then restarted. • The MIS has to merge the Auditinformation from two tickets. • The MIS has to set all executed Processes to completed and the produced Resources to available.
From MIS Production MIS sends specific changes
Specific Change ResourceCommand • MIS can • Create new Resources • Update for existing Resources • Change the Amount • Resource has to be known to Sender and Receiver • The implications are often not quite obvious.
Specific Change NodeInfo JMF (JDF 1.2) • Changes for the NodeInfo-Element Scheduling.- FirstStart- LastEnd- SetupDuration- CleanupDuration.. • JDF 1.3 = Resource JMF with the NodeInfo Resource
Specific Change ModifyNode • ActivationChanging the “Activation” Attribute. • CommentURLChanging the CommentURL Human readable digital Job bag • NewCommentAdd, Modify or Remove comments in the Ticket at any node.
Specific Change UpdateJDF • Complex Changes to the running Job possible. • Creation of new JDF Nodes • Modifying links in existing Processes • CreateResource • CreateLink • MoveResource • RemoveLink • JDF
UpdateJDF CreateResource ResourcePool Flat Cover Folded Cover RemoveLink JDF Cutting Folding SaddleStitch CreateLink
Specific Change NewJDF • Creation of new Jobs (Discouraged) • Creation of new Processes. ( GrayBoxes Expansion) • Production MIS • If a new process is created and executed the Device sends Status JMF which will be received by the MIS. • If the JobPartID is not known it’s difficult to handle those.
Summary Job resend • easier for the MIS. • only as long as the job is not running. Specific JMF • Receiver can reject the change. • MIS knows whether the change has been accepted. • Production to MIS can use the same functionality. • JMF can also be used in the „Triangle“ MIS, PrePress Controller, Press Controller
Summary • Change Order ICS • Workitem in the MIS WG • is not available yet
What does Prinect support? • ResubmitQueueEntry • ResourceCommand • Amounts • Media, Colors, Dimension, Device. • ModifyNode • Comments