FCC Design Study

FCC Design Study. R. Aleksan Saclay March 24, 2014. General News. FCC Kick-off meeting Etudes conjointes IHEP/ Tsinghua – Saclay CSTS-SPP. FCC-KICKOFF meeting. 341 personnes inscrites dont 17 personnes de Saclay inscrites (+ 2 du CEA Grenoble) , 9 du CNRS !.

rollo
Télécharger la présentation

FCC Design Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FCC Design Study R. Aleksan Saclay March 24, 2014 General News FCC Kick-off meeting Etudes conjointes IHEP/Tsinghua – Saclay CSTS-SPP

  2. FCC-KICKOFF meeting 341 personnes inscrites dont 17 personnes de Saclay inscrites (+ 2 du CEA Grenoble) , 9 du CNRS! L’agenda et toutes les présentations sont accessible à partir du site du meeting: http://indico.cern.ch/event/282344/

  3. Future Circular Collider Study - SCOPE CDR and cost review for the next ESU (2018) • Forming an international collaboration to study: • pp-collider (FCC-hh)  defining infrastructure requirements • e+e-collider (FCC-ee) as potential intermediate step • p-e (FCC-he) option • 80-100 km infrastructure in Geneva area ~16 T  100 TeVpp in 100 km ~20 T  100 TeVpp in 80 km Such a tunnel seems to be feasible (i.e. not a real breakthrough) (see Gotthard talk; F. Amberg) … but what would be the cost??? Slide de M. Benedikt

  4. Proposal for FCC Study Time Line Kick-off, collaboration forming, study plan and organisation Prepare Ph 1: Explore options “weak interaction” Workshop & Reviewidentification of baseline Ph 2: Conceptual study of baseline “strong interact.” Workshop & Review, cost model, LHC results  study re-scoping? Ph 3: Study consolidation Workshop & Review  contents of CDR 4 large FCC Workshops distributed over participating regions Report Release CDR & Workshop on next steps Comments RA: this schedule seems very difficult in my views … too slow ramping up! Slide de M. Benedikt

  5. Proposal for FCC WBS top level preliminary Slide de M. Benedikt

  6. FCC EU Design Study (DS) Proposal • Horizon2020 call – design study, deadline 02.09.2014 • Prepare proposal parallel to FCC collaboration setup • Goals fo EU DS: conceptual design, prototypes, cost estimates, … • From FP7 HiLumi LHC DS  positive experience: • 5-6 work packages as sub-set of FCC study • ~10-15 beneficiaries (signatories of the contract with EC) Time line complete draft proposal, end of June input from interested partners, end of May submission of EU FCC DS proposal, 2 Sept. iteration, agreements, signatures kick-off event discussions • March April May June July August September 2014 Non-EU partners can join asbeneficiary – signatorywith or w/o EC contribution (contractual commitment) or as associated partner – non-signatory(in-kind contribution with own funding, no contractual commitment) Comments RA: The DS proposal is being developed and discussed within ESGARD. Next meeting March 24 Slide de M. Benedikt

  7. TLEP VIDYO meetings • Every 2 weeks on Monday 15:00-17:00 • Emphasis in alternance Accelerator / Physics https://indico.cern.ch/categoryDisplay.py?categId=5208 (StillEmply!) https://indico.cern.ch/conferenceDisplay.py?confId=285205 December 2ndsee https://indico.cern.ch/conferenceDisplay.py?confId=287942 January 6thsee https://indico.cern.ch/conferenceDisplay.py?confId=296628 February 3rdsee https://indico.cern.ch/event/296629/ March 10thsee FHC (VHELHC) VIDYO meetings https://indico.cern.ch/categoryDisplay.py?categId=5258 Many meeting done: January 10, 27, 29, February 6, 10-11 Several meeting scheduled: March 20, May 26-28 (1st Hadron Collider Workshop)

  8. CEPC+SppC • For about 8 years, we have been talking about “What can be done after BEPCII in China” • Thanks to the discovery of the low mass Higgs boson, and stimulated by ideas of Circular Higgs Factories in the world, CEPC+SppC configuration was proposed in Sep. 2012 A 50-70 km tunnel is veryaffordable in China NOW Slides fromYifang Wang (IHEP director)

  9. Timeline (dream) • CPEC • Pre-study, R&D and preparation work • Pre-study: 2013-15 • Pre-CDR by the end of 2014 for R&D funding request • R&D: 2016-2020 • Engineering Design: 2015-2020 • Construction: 2021-2027 • Data taking: 2028-2035 • SppC • Pre-study, R&D and preparation work • Pre-study: 2013-2020 • R&D: 2020-2030 • Engineering Design: 2030-2035 • Construction: 2035-2042 • Data taking: 2042 - Comments RA: Veryaggressiveschedule!

  10. Etudes conjointes IHEP/Tsinghua- Saclay Intérêt fort de physiciens IHEP et Tsinghua pour CEPC (similaire à FCC) Il est de notre intérêt de suivre ces développements et éventuellement de faire des études conjointes Suite à la suggestion d’Eric, nous avons fait une demande de financement (modeste) dans le cadre du FCPPL pour explorer la mise en œuvre d’une telle collaboration i.e. faire quelques voyages exploratoires dans les 2 sens • Si convergence de vue et d’intérêts • Etudes de physique communes • R&D communes • accueil de thésard … Réponse en Avril lors du meeting FCPPL à Clermont-Ferrand

  11. CSTS- SPP 6 juin • Agenda: CSTS pour les futurs grands projets • ILC/CLIC • ILC/CLIC-R&D • FCC • Proposition Anne Isabelle pour FCC: • Une présentation générale sur le physics case du FCC par quelqu’un d’extérieur à l’IRFU (Ellis, Gianotti, Grojean…) • Une Présentation du groupe sur les activités IRFU

  12. Specifictopics for whichthereis an interestat Saclay Physics SUSY+other new physics: M. Besançon Invisible H and Z width: S. Ganjour Hgccdecays: F. Couderc Detectors Tracking (and calorimetry): P. Schwemling Calorimetry/Alim./Readout:E. Locci Accelerator Costing: P. Gastinel BeamOptic: J Payet, P. Nghiem