1 / 6

The JLab 12GeV Upgrade

CHL-2. The JLab 12GeV Upgrade. 12 GeV CEBAF. Upgrade magnets and power supplies. Add 5 cryomodules. Add arc. Two 1.1GV linacs. Add 5 cryomodules. Enhanced capabilities in existing Halls. JLAB in 2011. JLAB Today. N. Hall D Complex. A. C. B. Existing Experimental Halls.

ronat
Télécharger la présentation

The JLab 12GeV Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHL-2 The JLab 12GeV Upgrade 12 GeV CEBAF Upgrade magnets and power supplies Add 5 cryomodules Add arc Two 1.1GV linacs Add 5 cryomodules Enhanced capabilities in existing Halls

  2. JLAB in 2011 JLAB Today N Hall D Complex A C B Existing Experimental Halls

  3. Rendering of Hall D Complex – Overhead View Existing Facilities Service Building Hall D Cryo Plant Counting House N

  4. Hall D Complex Hall D Counting House Service Building Cryo Plant Tagger Area w/ Electron Beam Dump Photon Beam Dump N

  5. Hall D Complex – Site Plan from Drawings Service Building (Power Supplies, LCW equipment) Counting House Cryogenics Plant Connection to existing tunnel Collimator Enclosure Photon Pipe (10” concrete encased pipe) Tagger Area Hall D Electron Beam Dump Truck Access to Tagger Area Truck Access to Hall D Hall D Complex Drawings A001

  6. Photon beam and experimental area Tagger area Hall D North linac Electron Beam dump East arc Counting House Coherent Bremsstrahlung photon beam Radiator Photon Beam dump Pair Spectrometer Top View 75 m Solenoid- Based detector Collimator Electron beam / dump Tagger Area Experimental Hall D Collimator Cave

More Related