Chamber Production Status @ Aachen

Chamber Production Status @ Aachen. Superlayers: Chambers. **Partly assembled with old HVB from ISR. Right now, HVB for about 5 more SL still available (in total we had ISR-HVB for 34 SL). Some Remarks. Impact on mechanical preparation:

rose-ramsey
Télécharger la présentation

Chamber Production Status @ Aachen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chamber Production Status @ Aachen • Superlayers: • Chambers **Partly assembled with old HVB from ISR. Right now, HVB for about 5 more SL still available (in total we had ISR-HVB for 34 SL). Production Status at Aachen

  2. Some Remarks • Impact on mechanical preparation: • Slightly reduced production speed for about 3 weeks in August due to testbeam preparation. • Reasons for difference between mechanically produced and tested SL: • In March/April no HVB available until old HVB from ISR returned to Aachen. • Mid September assembly has to stop since all ISR-HVB are used up. • Reduced assembly speed due to chamber repair work at the ISR. • Reasons for difference assembled and tested SL: • Time without assembly due to HVB. • A break in testing was due to testing of new HVB in SL (2 months long-term test). Production Status at Aachen

  3. Experience with new HVB • New HVB were tested inside SL, in comparison with old HVB. • One SL was completely assembled with new HVB. 50% of two other SL’s were equipped with new HVB (once a layer, once a side). In total 24 HVB. • Under test since 02/07/2004. Observations: • At the beginning average SL noise about twice as high as usual. • No significant difference between old and new HVB in terms of noise (assume some humidity in the gas from the new HVB). • Noise reduced due normal level (~40 Hz/cell on average) after HV-training and time under gas. • Occasional current fluctuations with higher HV-settings (3.7/1.8/-1.4)kV of about 40 nA per max.32 channels. Production Status at Aachen