1 / 14

NCAB

NCAB. NETS redundancy topics - 15-Dec-2004 Jeff Custard business continuity design redundancy overview (current and future). Redundancy. Starts in the closet – redundant: power supplies switch supervisor modules switch uplinks and on to Layer 3:

rusti
Télécharger la présentation

NCAB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCAB NETS redundancy topics - 15-Dec-2004 Jeff Custard business continuity design redundancy overview (current and future)

  2. Redundancy Starts in the closet – redundant: power supplies switch supervisor modules switch uplinks and on to Layer 3: redundant routers (MSFCs in the switches)

  3. Redundancy And extends out to BPOP and FRGP connectivity – redundant: physical connection paths commodity carriers

  4. IPT redundancy At the server level -- redundant: power supplies hard drives server functionality

  5. IPT Current redundancy for (call processing): CCM call routing SRST Future redundancy for: long distance authorization Cisco Emergency Responder

  6. Layer3 restructuring project • http://www.scd.ucar.edu/nets/projects/layer3/index.html

  7. VoIP at UCAR • http://www.scd.ucar.edu/nets/projects/voip/

  8. BPOP • http://www.scd.ucar.edu/nets/projects/bpop/

  9. FRGP • http://www.frgp.net/

More Related