1 / 16

Tivoli Storage Management at Monash University 2 nd May 2006 Presentation for TUGANZ By

Tivoli Storage Management at Monash University 2 nd May 2006 Presentation for TUGANZ By Tony Cataldo. Topics Covered. Who am I? Monash Uni CV TSM @ Monash Uni Pre-August 2004 Post-August 2004 Issues Along the Way Future Acknowledgements/References Questions.

sage
Télécharger la présentation

Tivoli Storage Management at Monash University 2 nd May 2006 Presentation for TUGANZ By

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tivoli Storage Management at Monash University 2nd May 2006 Presentation for TUGANZ By Tony Cataldo

  2. Topics Covered • Who am I? • Monash Uni CV • TSM @ Monash Uni • Pre-August 2004 • Post-August 2004 • Issues Along the Way • Future • Acknowledgements/References • Questions

  3. Monash University CV • Established by Act of Parliament in 1958, first students in 1961 1 • Campuses in VIC – Berwick, Caulfield, Clayton, Gippsland, Parkville, Peninsula • International – Malaysia, South Africa • International Presence – London (UK), Prato (Italy) • Approx. 52,400 student enrolments and 5,952.5 (2,821.9 academic & 3,130.6 general) staff as at 31st March 2005 2 • Email provided to all students and staff • 230 staff dedicated to providing IS services to students & staff • ITS/Infrastructure Services: 85 staff • Notting Hill Pub – 1km from my office (walking distance) 1 History from Monash Uni web (http://www.monash.edu.au/about/history.html) 2 Statistics from Monash Uni web (http://www.monash.edu.au/about/stats.html)

  4. TSM @ Monash Uni • Implementation primarily for corporate data and business critical applications; • Email – for both students & staff • MyMonash (web portal) • WebCT (learning portal) • Callista (student admissions/admin) • SAP (Corporate ER) • Approx. 350+ servers (Solaris8/9/10, Linux-RH, WINxx, Netware)

  5. TSM @ Monash Uni cont. • Lots of time, resources, people & money been committed to this project • 15 people completed TSM training (3/5 days training • estimate 90 - 150* coffee & donuts consumed during this time.(* calc assumes: 15 people x 2 donuts x 3 or 5 days) • Non Supported Platforms (VAX VMS, SGI IRIS, WIN98, Solaris 7) by Monash.

  6. Pre-August 2004 • A year or two prior Monash Uni had a tender in the market for • Disk Storage Facility (DSF) • Backup/Restore Facility (BRF) • Submissions/presentations from all major IT vendors • These were evaluated against approximately 100 criteria (corporate, technical, price, risk) of various weighting • Shorted listed vendors invited to present again, then reference sites visited. • POC in early 2004 • Existing 24 TBs of SATA storage

  7. SAN Configuration

  8. People Resources • Infrastructure Services (approx. 85 staff in total) • Production Facilities: group size 9 • 1 person full time – Cyrus • 4 operators (rotating shifts 8am – 10pm) • 1 Data Center Mgr – Chris B • 1 Manager/PM – Steve W • Network: group size 25 • 2 people that primarily manage fibre installation & configuration of 4 Cisco 9505 – two fabrics blue & red (soon to be 6 switches – Research fabric) • Shared Systems: group size 21 • 3 people in Data Services Team: manage backup (TSM & Legato), SAN (FC & SATA with Virtualisation) & HSM – Stuart L, George, Tony • 15 Sys Admins – who manager servers on day-to-day basis on behalf of client groups • Number of staff involved in initial POC (Russell K, Richard, George, others)

  9. TSM System Resources (split over 2 data centers) • Servers • 2 x SUN Microsystems v440 (1 @ each site) • 8GB RAM, 4 x 36GB Internal hdd, 4422 GB SAN hdd • 4 HBA (2 JNI – for hdd, 2 Sun/QLogic for tape library) • Storage Array • 2 x IBM DS4500 with FC hdds (RAID 5) • 26.1 TBs of FC hdd (nearly fully utilised) • 2 x InfoTrend JBOD SATA with FalconStor/IPstor Virtualisation software • 24 TBs of SATA storage implemented (approx. 75% utilised) • DR Servers • 2 x SUN Microsystems v440 (1 @ each site) • 8GB RAM, 4 x 36GB Internal hdd • 1 being used as “TPC for Data” machine

  10. TSM Logical Diagram [draw diagram on whiteboard/flip board

  11. Post-August 2004 • Have migrated 320 of 350 servers to new backup infrastructure. • Callista, SAP, Novell and Library server migration has been completed. • Currently storing an average of 22 TBs per week on tape • Data protection and DR resilience is improved as data on tape is replicated in both silos.

  12. Issues Along the Way • Issues with Solaris server with large # of small files • use of snapshots (scripting with Storage Array) • Issues with servers with over 4 million files on Netware server • 6-8months for patch(es) from IBM/Novell. • Critical incident with IBM (TSM & SAN) • Lack of understanding/culture/comms b/n companies. Confusion b/n hardware/software support & contracts. • New group of IBM people involved in resolving issues. • Lack of LTO2 drives in libraries • Reclaimation was frequently killed or switched off. Now have additional drives. • Faulty LTO3 drive caused the tape library (IBM 3584) to become unavailable to TSM. • Drive zero was replaced, after much anguish.

  13. Issues Along the Way cont. • Solaris 9/RDAC combination only allows maximum 32 LUNs, with 2 logical TSM systems on each server, limited to 15 LUN/TSM server. • Converting stg LUNs from 101GB to 201GB. • Initially disk storage pools used then combined with file storage pools. • In the process of re-configuring LUNs and TSM storage pools to improve TSM threading (read/write) to hdd pools.

  14. Future • Storage Resource Management (TPC for Data) • Migration of all LTO2 drives & tapes to LTO3 drives & tapes • Support for AFS on Linux (RH) • In SAN space currently testing iSCSI • Will be conducting a review storage virtualisation this year (currently using IPstor on SATA storage)

  15. Acknowledgements/References • Acknowledgements • Steve White; various ppt & discussion • Cyrus Khavar/Chris Bourke; discussion & answers • George Scott/Stuart Lamble – discussion, answers, coverage • Russell Keil – discussion on POC, SAN diagram • References • www.monash.edu.au

  16. Questions

More Related