1 / 7

Math project

Math project. Task 1. Cont. Task:1. Q 1 ] Sprint: 25.75+ 0.30X Verizon:55.50+ 0.10X Cingular: 0.75X Q 2 ] 1)60→140 minutes . 2)150→200 minutes 3)0→50 minutes 4) sprint 5) Verizon 6) 150minutes 7)Verizon, Because it is the cheapest company. Cont. task 1. Q 3]

sai
Télécharger la présentation

Math project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Math project

  2. Task 1

  3. Cont. Task:1 Q 1] Sprint: 25.75+0.30X • Verizon:55.50+0.10X • Cingular: 0.75X Q 2] • 1)60→140 minutes. • 2)150→200 minutes • 3)0→50 minutes • 4)sprint • 5)Verizon • 6)150minutes • 7)Verizon, Because it is the cheapest company.

  4. Cont. task 1 • Q 3] • 25.75+0.30X= 55.50+0.10X • 0.30X-0.10= 55.50-25.75 • 0.2X      =29.75 • 0.2             0.2 • X=148.75

  5. Task: 2  Q1] • a. 48/3= 16 tricycles • b.  tx3=w Q2] • a.    1) 5x3=15 Wheels for tricycles     15/3 = 5 tricycles 2) 50-15=39 Wheels for bicycles       35/2 = 17.5 bicycles • b.  B < t      17.5<5        2x>/ 5

  6. Cont. task :2 • C)

  7. Task:3 • Visit our website: http://Athsmathproject.yolasite.com/

More Related