1 / 8

T1008 status

T1008 status. W.Baldini for the Ferrara and Padova SuperB -IFR Group. The Prototype. Iron. Active Layers (Pizza Boxes). Prototype. Iron: 60x60x92 cm 3 , 9 slots for the active layers up to 9 active layers readout together 4 Time Readout (TDC-RO) “standard “

saniya
Télécharger la présentation

T1008 status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T1008 status W.Baldini for the Ferrara and PadovaSuperB-IFR Group

  2. The Prototype Iron Active Layers (Pizza Boxes) Prototype • Iron: 60x60x92 cm3, 9 slots for the active layers • up to 9 active layers readout together • 4 Time Readout (TDC-RO) “standard “ • 4 Binary Readout (BiRo) “standard” • 4 special modules to study different • fibers or SiPM geometry Active Layer (“pizza box”)

  3. Summary of activities and plans for next days • Installation and setting up: July 13-19 • Security walkthrough: July 19, first beam: July 20 • So far we have taken data at 8, 6, 4, 2, 1 GeV: • Tue 27 – Wed 28: main injector intervention, evacuate Cherenkov from N2 and start filling with C4F8O • Start @ 8 GeV, with low pressure and then increase the pressure and decrease the energy:

  4. Cherenkov pressure scan: 8 GeV (N2) Expected pion thres.: 7.5 psi Expected muon thres.: 4.3 psi (cher1xS1xS2) counts/ beam counts N2 Pressure (psi)

  5. Cherenkov pressure scan: 6 GeV Exp. Muonthres. : 7.7 psi Exp. Muonthres.: 13.4 psi Normalized Cherenkov counts Normalized S1xS2xC1 counts

  6. Cherenkov pressure scan: 4 GeV Exp. Muon thres: 17.3 psi

  7. Time Of Flight Essentially no differences from 1 to 6 GeV Expected mu-pi time difference (assuming ~20m distance): - 1 GeV : ~ 230 ps - 2 GeV: ~ 60 ps - 3 GeV ~ 13 ps - TOF exp. Resolution: 30 ps

  8. First results Efficiency @ 3.5 p.e. Threshold scan @ 8 GeV

More Related