1 / 5

CATS EHV Update

CATS EHV Update . January 13, 2009. CATS EHV Status Update. CATS EHV met on 1/6/09 New Chairman 2009 study work has been revised Mega-project analysis delayed until 2010 Biennial Transmission Assessment (BTA) work will be performed in 2009. 2009 Mega-Project Study Update.

sanjiv
Télécharger la présentation

CATS EHV Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CATS EHV Update January 13, 2009

  2. CATS EHV Status Update • CATS EHV met on 1/6/09 • New Chairman • 2009 study work has been revised • Mega-project analysis delayed until 2010 • Biennial Transmission Assessment (BTA) work will be performed in 2009

  3. 2009 Mega-Project Study Update • Determine impact of large generation injections at Arizona 500 kV busses • Determine transmission to support injections of 1000-3000MW • Mega-Project study coincides with • Statutory requirements of BTA • ACC-required Arizona Renewables report • NERC compliance study work • Total Transfer Capability (TTC) study work • Mega-Project Study delayed. Review study plan late 2009 to prepare for 2010 work

  4. 2009 BTA Study • CATS EHV will perform the following analyses • Ten Year Snapshot Study • N-1-1 Study • Extreme Contingency Study • RMR Studies for the Phoenix Metro area

  5. Contact Information LeeAnn Torkelson Salt River Project 602.236.0973 leeann.torkelson@srpnet.com

More Related