1 / 14

KEK CC - present and future -

KEK CC - present and future -. Mitsuaki NOZAKi (KEK). KEK C urrent Core Activities. J-PARC in Tokai. KEKB-Factory. ILC Test Facility. STF. LHC at CERN. ATF. Photon Factory. Quest for Birth-Evolution o f Universe. Quest for Unifying Matter and Force.

sari
Télécharger la présentation

KEK CC - present and future -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEK CC- present and future - MitsuakiNOZAKi (KEK)

  2. KEK Current Core Activities J-PARC in Tokai KEKB-Factory ILC Test Facility STF LHC at CERN ATF Photon Factory

  3. Quest for Birth-Evolution of Universe Quest for Unifying Matter and Force International Linear Collider(ILC) Lepton Quark Lepton CPAsymmetry Scientific Activities Technology Innovation Encouraging Human Resources Beyond Standard Physics Power-Upgrade Super-KEKB J-PARC LHC KEK-B Quark CP Asymmetry nt [Origin of Matter] nm Quest for Neutrinos ne Quest for 6 Quarks [Origin of Force] Higgs Particle[Origin of Mass]

  4. From KEKB to SuperKEKB

  5. KEK CC • KEK staff • 15 researchers + 8 engineers • Contractors • ~20 SE’s • Budget ~20 Oku-yen/year • Central computing system : 5 Oku-yen • Network : 2 Oku-yen • B factory: 5 Oku-yen • Super-computer : 7 Oku-yen • Others : 1 Oku-yen

  6. Rental from IBM ( Feb. 2009~Feb. 2012) Work Server, Computing Server Program development, Job submission, etc. IBM System x3550(Xeon-QX 5460 x2, memory 16GB) Computing Server : 84 nodes, 11500 SPECint_rate2006 RHEL5 Platform LSF HPC Software CERNLIB, Geant4, CLHEP and ROOT Monte Carlo Simulation codes Storage System HPSS : 3PB Disk storage : 205 TB Central Computing System : KEKcc Computing Servers GRID System HPSS Data Server/ File Servers CPU : 640 cores DISK : 200 TB TAPE : 3 PB HPSS : 3PB Tape Library (High Performance Storage System) Current Status and Future Plans at CRC.KEK The 3rd CC.IN2P3-CRC.KEK Meeting 6

  7. B Factory Computer System CPU : 4000 core DISK : 1.5 PB TAPE : 3.5 PB Computing Server 480 nodes (12k SPECint2006 1.5PB Disk Storage 3.5PB Tape Library 2008/10/21 KEK site report - HEPiX fall 2008, Taipei 7 • Rental from NetOne (Mar. 2006 ~ Feb. 2012) • Computing Servers • DELL Power Edge M600 (Xeon QX 5460 x2, memory 4GB) • 480 nodes : 70,000 SPECint_rate2006 • Linux(CentOS/CS) • Disk Storage System • 1.5PB, 45 FileServers • HSM : 910TB, non HSM : 630TB • Tape Library System: Petaserv(SONY) • 3.5PB + 68drive(SAIT1/2) + 14servers • SAIT 500GB/volume 7000 volumes • 30MB/s (SAIT1) 45MB/s(SAIT2) 7 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK

  8. Supercomputer System • Hitachi SR11000 K1 System • 16 nodes • 2.15 Tflops (Theoretical peak ) • 512GB memory • IBM BlueGene Solution • 10 racks, 1024nodes/rack • 57.3 Tflops (Theoretical peak) • Massive parallel system • for Lattice QCD simulation CPU : 2.15 TFlops Memory : 512 GB HITACH SR11000K1 CPU (SR) : 57.3 TFlops Memory : 5 TB IBM BlueGene ジョブ使用率 A:81% B:98% 8 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK

  9. Upgrade plan

  10. Future prospect of KEK CC • Tier-0 for Belle-II (2014~ ?) • Tier-1 centers in Asia, Europe, Americas • What if Super-KEKB and Super-B merges ? • Tier-1 or 2 for SLHC (20xx~) ? • Needs discussion with ICEPP and ATLAS-J • Continue R&D • GRID, GEANT4, GRACE, DAQ,…

  11. ICEPPATLAS Tier 2 Tape Robot PC Servers Disk Arrays Disk Arrays ~270 m2

  12. Global link • Asian accelerator network • G5 (China, India, Korea, Japan, Russia) • Launched last December on the DG’s initiative • Link to Europe through FxPPL (x=c,j,k,v) • Why not “geographical enlargement” of FJPPL • Start with computing centers; • CCIN2P3-KEK-KISTI-GRIDKA • Then invite other countries

  13. Merci.

More Related