Task 24 “ Wind Energy and Hydrogen Integration” 60 th Ex-Co Meeting

Task 24 “ Wind Energy and Hydrogen Integration” 60 th Ex-Co Meeting. May 2009 San Francisco Mr. Ismael Aso Industrial Engineer (Saragossa University) European Master in Renewable Energies (CIRCE) PhD “Renewable Energies and Energetic Efficiency (Saragossa University)

sauda
Télécharger la présentation

Task 24 “ Wind Energy and Hydrogen Integration” 60 th Ex-Co Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task 24 “ Wind Energy and Hydrogen Integration” 60 th Ex-Co Meeting May 2009 San Francisco Mr. Ismael Aso Industrial Engineer (Saragossa University) European Master in Renewable Energies (CIRCE) PhD “Renewable Energies and Energetic Efficiency (Saragossa University) R & D Aragon Hydrogen Foundation (SPAIN)

  2. INDEX Task 24 Description • Objectives • Prior Steps • Members • Activities last 6 months. • Case Studies Interest in Spain related to Wind/Hydrogen Final Questions for the Ex-Co

  3. OBJECTIVES TASK 24: To explore in detail all possible issues (Technical, Economical, Social, Environmental, Market and Legal) related to hydrogen production using electrolysis with wind energy. To explore in detail possible applications for hydrogen produced by electrolysis using wind energy, with special emphasis on full wind & hydrogen integration by means of hydrogen storage and electrical conversion that balances the original wind energy production, allowing an approach to demand that closes the gap with conventional energies. Subtask A: State of the Art Subtask B: Needed Improvements and System Integration Subtask C: Business Concept Development Subtask D: Applications. Emphasis on Wind Energy Management Duration : 2006-2010

  4. PRIOR STEPS 53rd IEA HIA ExCo meeting (Singapore, November 2005): Interest on new task on “wind energy & hydrogen integration”. The Spanish representative takes the lead. 54th IEA HIA ExCo meeting (Lyon, June 2006):Dr. Luis Correas (Fundación Hidrógeno Aragón) and Mr. Fernando Tamayo (Gamesa Energía),presented afirst draftof the new task. Project Definition Meeting (Brussels, 4th October 2006):attendance of 15 people from 7 countries. Revised draft with a matured work plan proposal. Pending confirmation of participation, especially from electrolyser manufacturers. 55th IEA HIA ExCo meeting (Petten, November 2006): the Task is finally approved by the ExCo, and a kick-off meeting was made for spring 2007 – Huesca , in order to confirm participation. 56 th IEA HIA EXCo Meeting (Rapperswill, May 2007): First SAR showed and first Meeting , Canary Island October 2007 57 th IEA ExCo Meeting (Montecatini, November 2007): First annual report. Second Meeting Athens 58 th IEA ExCo Meeting (Brisbane, July 2008): Oral presentation WHEC 59 th IEA ExCo Meeting (Athens, October 2008): Third meeting in Switzerland

  5. MEMBERS 19 Experts, 9 Countries

  6. Kick-Off Meeting – Huesca April 2007 Second Meeting – Athens April 2008 First Meeting – Canary Island October 2007 Third Meeting – Switzerland October 2008 Fourth Meeting – USA April 2009

  7. ACTIVITIES DURING THE LAST 6 MONTHS Fourth Meeting in Denver – Hosted by NREL

  8. ACTIVITIES DURING THE LAST 6 MONTHS

  9. ACTIVITIES DURING THE LAST 6 MONTHS - MINUTES

  10. ACTIVITIES DURING THE LAST 6 MONTHS http://task24.hidrogenoaragon.org

  11. ACTIVITIES DURING THE LAST SIX MONTHS • Private web page Actualize

  12. Visits WEBPAGE

  13. Visits WEBPAGE • April 2008- September 2008 • September 2008- April 2009

  14. Diffusion Control: Congress 1- HYPOTHESIS VIII - HYdrogen – POwer THeoretical and Engineering Solutions International Symposium 1-3 April 2009 Lisbon (Portugal) “Simulations with HOGA Software and General Description of a Real Hydrogen Isolated Hybrid Renewable Plant – IHAVU Project 2- Energética XXI: “Energía Eólica e Hidrógeno, una Iniciativa y Necesidad a Nivel Internacional” March 20. DYNA. 3-TechwindGrid`09 20-21 Madrid “Task 24: Wind Energy and Hydrogen Integration”. Madrid April 2009 4- Building the Hydrogen & Fuel Cells Future Conference 25th March 2009, Gallery Suite, NEC Birmingham “Green Hydrogen from Wind and Solar: Design, Construction and one year operation of the ITHER Project” 5- NHA Conference and Hydrogen Expo march 30-April 2009 Columbia. 6 – Hannover Fair 20-25 April 7- Analysis and operation of a Wind-Hydrogen Pilot Plant. Germany April 2009

  15. WORK PLAN

  16. Subtask A – State of the Art (Aaron, Rafael, Attilio) – Version III End of June Simulation Tool Report: Javier Pino

  17. Subtask B – Needed Improvements and System Integration

  18. Subtask C – Business Concept Development (Jorg Linneman – Klaus New Draft Document End June

  19. Subtask D – Emphasis on Wind energy Management

  20. Demonstration Projects (Wind/Hydrogen) Wind2H2 (USA)

  21. Demonstration Projects (Wind/Hydrogen) - Spain ITHER (Huesca) Sotavento (Lugo) Tahivilla (Cadiz) RES2H2 (Canarias)

  22. Possible scenario which can happen 2010… Why so Interest in Spain? P.O. 3.7: Programming of non-dispatchable renewable energy. The Operator of the Electrical System can reduce (curtail) the wind energy produced on behalf of the stability of the grid 7.716 MW Nuclear + 70 % Wind Power Install 20.155 MW = 21.824 MW

  23. 2 November Sunday 2008…… 37 % Wind Power was Disconnected

  24. The Cicada and the Ant, from the "Fables" by Jean De La Fontaine

  25. V Anniversaries – Aragón Hydrogen Foundation

  26. Final Questions for the Ex-Co: • New Zeeland will join task 24. • No formal position about Gamesa as Operagent Agent phase II Aragon Hydrogen Foundation assume this role for all task • Encourage Ex-Co members to propose new members for task, mainly private companies (case IHT Switzerland) … France, Norway, etc.

  27. Thanks for your Attention!!! 60 th Ex-Co Meeting San Francisco Mr. Ismael Aso www.hidrogenoaragon.org iaso@hidrogenoaragon.org