1 / 8

APT STEERING COMMITTEE

APT STEERING COMMITTEE. Feedback to RPF Meeting 20/21 May 2003. APT STEERING COMMITTEE 22 January 2003. Role of steering committee Prioritise APT research To co-ordinate research related to APT projects To plan related testing (long and short term)

scot
Télécharger la présentation

APT STEERING COMMITTEE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APT STEERING COMMITTEE Feedback to RPF Meeting 20/21 May 2003

  2. APT STEERING COMMITTEE22 January 2003 • Role of steering committee • Prioritise APT research • To co-ordinate research related to APT projects • To plan related testing (long and short term) • To serve as an advisory body to Gautrans HVS testing programme • To give comments on APT work proposals • To give comments on APT reports • Prioritise work for 2003

  3. PRIORITY RESEARCH AREAS • Cold recycling (ETB & Foam):   • Material design /material types • Validation of performance models • Active filler / binder content • Suitable materials for intersections • Asphalt overlays - comparison

  4. PRIORITY LIST (con.) • Upgrading of gravel roads • Flexible surfacing for low-volume roads • Individual, new and innovative designs • Low-cost roads • Vehicle-pavement interaction related to dynamic loads and contact stresses • Concrete pavements • Stabilisation of sands

  5. OPTIONS FOR FUTURE TESTING

  6. PRIORITISATION CRITERIA • Research need • Road Authority need • Funding availability • Complimentary benefits • Cost • Regional (SADC) benefits • Ease of logistics • Provision of supplementary information

  7. PRIORITIES

  8. ACTION PLAN • HVS to remain in Cape Town until October ‘03 to test N7 fast and LVRs • HVS to return to Gauteng in October ’03 to test concrete pavements on N4 toll plaza • CSIR/Gautrans to investigate the inclusion of dynamic loading into test sections • CSIR/KZN DoT to develop a proposal for a full-scale investigation of sand stabilisation (not necessarily including the HVS) • CSIR to submit a proposal to Gautrans re ETB sites (ETB section now on N7)

More Related