1 / 3

Must view in slide show mode 1 MW wind towers, 1000 feet apart Links:

Wind Farm Required to Replace California’s Diablo Canyon Nuclear Power Plant Located on the Big Sur Coast of the Los Padres National Forest. Must view in slide show mode 1 MW wind towers, 1000 feet apart Links: Jim Zin’s Diablo Canyon Web Site National Wind Watch Web Site. Diablo Canyon.

sean-madden
Télécharger la présentation

Must view in slide show mode 1 MW wind towers, 1000 feet apart Links:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Farm Required to Replace California’s Diablo Canyon Nuclear Power Plant Located on the Big Sur Coast of the Los Padres National Forest Must view in slide show mode 1 MW wind towers, 1000 feet apart Links: Jim Zin’s Diablo Canyon Web Site National Wind Watch Web Site

  2. Diablo Canyon

  3. California Coast Power Diablo Canyon 2200 MW Power Plant Wind Farm Equivalent The area shown assumes wind blowing 100% of the time. In reality, it’s 30% at best, so the actual area required is 3x larger!

More Related