1 / 33

BIHAR AN INTRODUCTION

BIHAR AN INTRODUCTION. ABOUT BIHAR WATERSHED DEVLOPMENT SOCIETY (BWDS) AS SLNA. Formation of BWDS (SLNA) vide notification No. 264 dated 18.3.2010 Registration of the BWDS No. 869 dated 2 9.4.2010 Appoint on deputation of Project

sevita
Télécharger la présentation

BIHAR AN INTRODUCTION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIHAR AN INTRODUCTION

  2. ABOUT BIHAR WATERSHED DEVLOPMENT SOCIETY (BWDS) AS SLNA Formation of BWDS (SLNA) vide notification No. 264 dated 18.3.2010 Registration of the BWDS No. 869 dated 2 9.4.2010 Appoint on deputation of Project Director-Com-CEO No. 403 dated 4.5.2010 Deputation of two Technical Experts in BWDS No. 460 dated 13.5.2010 Two saving Accounts (Administrative A/c & Project A/c) is Opened on 16.5.2010

  3. Human Population and Literacy rate (2001 census) Population : • Literacy rate : Percentage of population below poverty line :

  4. Total Geographical Area ----- 94.17 lakh Ha. • Arable Land ----- 55.72 Lakh Ha. • Irrigated Area ----- 30.34 Lakh Ha. • Total Rain fed Area ----- 25.39 Lakh Ha. • Waste Land ----- 5.44 Lakh Ha.

  5. Annexure II

  6. Annexure II Contd…

  7. Annexure II Contd…

  8. Annexure II Contd…

  9. Annexure II Contd…

  10. Annexure II Contd…

  11. Annexure II Contd…

  12. Annexure II Contd…

  13. Annexure II Contd…

  14. Annexure II Contd…

  15. Annexure II Contd…

  16. Annexure II Contd…

  17. Annexure II Contd…

  18. Annexure II Contd…

  19. Annexure II Contd…

  20. Annexure II Contd…

  21. Annexure II Contd…

  22. Annexure II Contd…

  23. Annexure II Contd…

  24. Annexure II Contd…

  25. Annexure II Contd…

  26. Annexure II Contd…

  27. Annexure II Contd…

  28. Annexure I contd….

  29. Annexure I contd….

  30. Annexure I contd….

  31. Planning for Project s to be taken up under IWMP during 2010-11 Total Area: Will be Reported within a week Total Cost: Will be Reported within a week Preparation of PPR/SPSP Shall be submitted by Sept. 2010 Engagement of Staff (SLNA/DC/WC ) Next 4 Months Preparation of DPR By March 2011

  32. THANKS

More Related