An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Organization of PJM States, Inc.Gas/Electric Panel Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013

  2. Columbia Pipeline Group (CPG) Pipeline • More than 15,000 Miles • Columbia Gas: 12,000 Miles • Columbia Gulf: 3,400 Miles • Millennium: 180 Miles • Crossroads: 200 Miles • Delivers Approximately 1.3 Tcf per Year • 5% of U.S. Market • Serves Customers in 16 States Compression • 1.1 Million Horsepower • 104 Stations • Gulf: 77 Units • TCO: 316 Units • Millennium: 2 Units Storage • 280 MMDth • 4.7 Bcf/Deliverability • 37 Storage Fields in Four States Power Generation • 27 Power Plants on System • 19 on Columbia Gas in PJM • 7 on Columbia Gulf are bound for MISO • 1 on Millennium in NYISO • 19.8 GW Capacity (12.7 GW in PJM) 2

  3. Collaboration • Columbia Gas Transmission & PJM Collaboration • Non Disclosure Agreement • Joint Gas/Electric Harmonization Interests 3

  4. Power Generation along TCO System 4 4

  5. US Generation Demand by Fuel Coal Oil Gas Hydro Other Renewable Nuclear SOURCE: Pira 2012

  6. PJM Interconnection Gas fired generation continues to gain market share over coal in PJM. Net Generation Demand Gas vs Coal

  7. PJM Reserve Margins PJM Projected Generation Surplus / Deficit High Case Base Case Low Case SOURCE: SNL Jan 2013

  8. Power Load Challenges • Gas vs. Power day disconnect • Limited communications between participants • Pressure guarantees • Penalties may not incentivize desired behavior • Daily vs. hourly contracting • Lack of firm transport held by power generators • Primary firm, secondary firm & Interruptible • Not nominating proper quantities • Does not provide for proper hourly flows • Does not cover required transport quantity • Swings on pipeline line pack • Not nominating primary receipt points Electric FERC Gas

  9. Power Gen Transportation 9

  10. Power Gen Transportation

  11. The Puzzle FERC PRODUCERS ? POWER GENERATORS MARKETERS ISO/RTO PIPELINES

  12. Things to Consider • Encourage use of adequate transportation agreements: • PJM to hold transport and release to generators? • Flow through mechanism for transportation charges? • Ask gas supply questions when dispatching: • What type of transport (FT or IT)? • What Priority (in the path or out of path)? • Do you have supply for your transport? • Develop new services if needed – customer driven effort. • Encourage new and needed infrastructure • Address disconnects between Gas & Electric communications & and energy days.