1 / 10

Murphy’s Law is Alive and Well

Murphy’s Law is Alive and Well. Taking An Exhibit from Conception through Production through Installation…. Defining the Experience Developing Partnerships Visitor Experience Matrix Project Timetable Final Piece of the Equation. Defining the Experience . Proactive Buy In from Community

shanon
Télécharger la présentation

Murphy’s Law is Alive and Well

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Murphy’s Law is Alive and Well Taking An Exhibit from Conception through Production through Installation…

  2. Defining the Experience • Developing Partnerships • Visitor Experience Matrix • Project Timetable • Final Piece of the Equation

  3. Defining the Experience • Proactive Buy In from Community • Who is our audience? • What does the community want us to deliver? • How will we deliver the experience?

  4. Developing Partnerships • Find people who share the passion for the project. • Who are the major players? • What industry is here in Orlando? • Media partners • Funding partners • Content partners

  5. Visitor Experience Matrix

  6. Project Timetable: R&D Concept Development (Up to 12 months) • Research the topic • Conduct front-end evaluation • Build visitor experience matrix • Develop interactives, etc. • Develop overall design parameters • Conduct multi-stage prototyping • Conduct formative evaluation • Produce fabrication drawings

  7. Project Timetable: Production Production through Opening (Up to 12 months) • Fabricate exhibit components • Produce all graphic, etc. labels and panels • Install all components • Launch public opening • Conduct summative evaluation • Write final report

  8. So, where’s the challenge? • Team training as membership changes • Value engineering: budget • Value engineering: timetable • Annual grant caps that affect timetable • The final piece of the equation is unknown until the project is launched…

  9. …How will visitors use the exhibit and the space? • Unforeseen uses, like a 6-stop elevator that becomes an attraction unto itself • Multiple entrances to a facility or an exhibit, leading to confusion on the “main entrance” • Maintenance success is a direct result of how familiar the team is with the exhibits (outside fabricators vs. in-house fabricators) • Sustainability issues, if unresolved, will come to the forefront immediately

  10. Taking an exhibit from conception through production through installation… …through reality, controlled chaos and constant new information.