An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Validation Objectives –Operational Requirements John Gonda Dijana Pasic

  2. Validation Objectives – Operational Reqmts • ENVA Sub-Group Formed at Langen • Initial Objective: 4DTRAD Sensitivity Analysis Deep Dive • VSG ACTION resolution - Broke up into smaller sub-sub groups to address each ENVA service separately • Progress: • Developing Comment Matrix and meeting minutes • Developed Service VO-OR Excel spreadsheet to dentify VOs • Developing Validation Scenarios • Reconvened ENVB Ad Hoc (B Team) after VSG telecon #2

  3. VO-OR Analysis Sub Sub Group Results

  4. ADS-C Operational Validation Objectives Examples (ref: SPR.H Chapter 4) OVO 1 Validate the EPP report supports the 4DTRAD Service OVO 1.1 Validate the content of the EPP report is necessary and sufficient to support the 4DTRAD service operations. OVO 1.2 Validate the EPP change events are necessary and sufficient for 4DTRAD Service requirements. OVO 1.3…n Validate the default EPP change event tolerances are sufficient for the 4DTRAD service, etc. OVO 2 Validate the METEO report supports the 4DTRAD Service requirements. OVO 2.1 Validate the content of the METEO report is necessary and sufficient to support the 4DTRAD service requirements. OVO 3 Validate the ETA MIN/MAX report supports the 4DTRAD Service requirements. OVO 3.1 Validate the content of the ETA MIN/MAX report is necessary and sufficient for the 4DTRAD service requirements.

  5. Future ENVA Plans Sub Sub Groups continue work individually or by telcon • Expect all Service VO-OR Spreadsheets complete by June 15 • Incorporated into Master VO-OR spreadsheet • Progressing Service VO-OR Comment Matrices. ECD June 15 • Provided to VSG/CSG • Developing VO Scenarios. ECD June 15 • Initial set of VOs identified and mapped to scenarios • Meet F2F in late June • Location TBD (Atlantic City?)

  6. Future ENVB Plan • Reconvene B Team • Replicate ENVA process focusing on differences with ENVA – ECD July 15

  7. Backups