An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design & Engineering Team Presentation on Developing Borough Infrastructure – Northwold Road 2013/14

  2. Supported by Chris proctor- Team Manager Andrew Pillai – Senior Engineer Presented By Ugo IhesienePrincipal Road Safety Engineer

  3. Why are we doing this? • Awareness • Staff engagement • Sharing of ideas & experiences • Developing a better scheme • Collaborative/joined up working

  4. Coverage/Scope • Introduction • Scheme Background • Proposals • Consultations/Approvals • Implementation • Questions & Discussion

  5. Introduction (Overview) • Northwold Road location/ward • Amenities – schools, bus route, shops, recreational park etc. • Road collision data • Current collision reduction measures

  6. Scheme Background • Why are we considering proposal in Northwold Road? To upgrade the public realm, traffic calm, assist in improving and regenerating the area • Funding – The scheme is a newly developed proposal. It was not included in the 2011 LIP and it is funded from Developing Borough Infrastructure • Delivery – 2013/14 financial year

  7. Reighton Road Durlston Road Norcott Road Proposals – Widening of pavements & Entry Treatments

  8. Narford Road Rossington Street Gelderston Road (2 sides) Alconbury Road Alkham Road Proposals – Entry Treatments

  9. Kyverdale Road Junction Tables

  10. Maintenance: Review existing tactile paving at crossing point O/S NW Primary school & re-align to approved standard Review existing speed table O/S NW Primary school & amend ramp gradient to approved standard Miscellaneous

  11. Miscellaneous (Cont.) De-clutter Street Signs: • On & opposite Alkham road

  12. Miscellaneous (Cont.) Other Safety improvements: • Adjust bus Stand east of Alkham Road in easterly direction to improve visibility. • SUDs – We have not yet considered – Needs Input from Adam

  13. Where do we go from here? • Senior Management/Lead Member Draft approval of proposals • Stakeholders Draft consultation • Public Consultation • Decision Audit approval • Traffic Regulation Order • Public Notification of works • Implementation

  14. QUESTION TIME ?

  15. Your contributions are welcome: • Speak to Chris, Andrew, or me • E-mail us if you prefer • Show examples of any better ideas you may have come across.

  16. FURTHER INFORMATION Any questions or further information please e-mail to one of us at: ugo.ihesiene@hackney.gov.uk Andrew.pillai@hackney.gov.uk Chris.proctor@hackney.gov.uk

  17. THANK YOU!