1 / 32

Tim Hewson 17 th June 2005

Operational Use of ECMWF products at the Met Office: Current practice, Verification and Ideas for the future. Tim Hewson 17 th June 2005. Contents. Describe use of ECMWF output, in the Operations Centre at the Met Office (which provides guidance to the outfield), in 3 forecast categories:

shen
Télécharger la présentation

Tim Hewson 17 th June 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational Use of ECMWF products at the Met Office: Current practice, Verification and Ideas for the future Tim Hewson 17th June 2005

  2. Contents • Describe use of ECMWF output, in the Operations Centre at the Met Office (which provides guidance to the outfield), in 3 forecast categories: • 1. ‘Short range’ (up to 36 hours) • 2. ‘Medium range’ (36 hours to 6 days) • 3. ‘Trend period’ (6 to 10 days) • 4. Some verification ideas (severe weather)

  3. 1. Short Range • Relatively recent changes in ECMWF operational suite (2 operational runs per day, much reduced delay in forecast arrival time, etc) render ECMWF operational runs much more useful for short range forecasting than hitherto • Data time (DT) difference c.f. Met Office operational runs now averages 9 hours (previously it was 21 hours) • 9 hours is comparable to the short period lead time gain of ECMWF over Met Office (10 hours), implying high potential for adding value to deterministic forecasts using the consensus (“poor man’s ensemble”) approach • Though not necessarily part of the ‘ECMWF remit’ if ECMWF model output can potentially improve our short range forecasts we will use it • Some use also made of ensemble data (though much less than in the medium range – due to reduced reliability of severe weather probabilities)

  4. RANK Best - EC  UK  FR.. Lead time gain = 10 hours Operational Model Errors NH rms MSLP error vs Lead Time 15days 10 short range | medium range | trend period |

  5. OBS MOD RAW RAW Short Range Forecast Example Cloud cover Ppn rate Ppn type Mslp

  6. Verification of Modifications • “What was it, specifically, about the good forecast that made it better?” • Helps highlight common model errors

  7. Scope for Improvement • Forecasters are usually able to improve upon raw (Met Office) model output, using different models, knowledge of systematic errors, comparison with current trends • Degree of improvement could potentially be increased by making more use of the high quality ECMWF operational run, which at present is under-utilised • WISH LIST! – • 3 hourly data, T+0 to T+48 • Instantaneous total ppn rates, plus cloud cover and mslp (same format?!) • Separate plots showing dynamic /convective rain and snow components • 10m mean wind and likely gust strength • Sub areas – parts of Europe ? • Timely appearance on ECMWF web site is crucial (probably the most expedient route for making this data available)

  8. Severe Weather • Table records ‘Significant Errors’, from perspective of hazardous weather, in Raw (Red) and Modified (Blue) forecasts (2.5 years of data) • A key forecasting target is a reduction in the number of blue boxes • This verification has highlighted warm air summer convection as one area where the forecaster is able to add little value, and where there can be major errors in the model • Potentially ECMWF oper runs could assist in this area, via the wish list data? (convective characteristics?) • Cold air convection is also a problem area, though one that the forecaster often addresses reasonably successfully. FGEW verification has highlighted this as a significant weakness in ECMWF output (snow in NE’lies, Feb/Mar 2005) • Low pressure centres and surface wind gusts in strong gradient regions are another sig problem

  9. 2. Medium Range • Use of ECMWF data - operational and ensemble runs - is more common in the medium range • Timeliness is a key issue for practical applications; recently the ECMWF web site has been used more often, because of timely updating • Issued forecast guidance has both deterministic and probabilistic components

  10. Deterministic Component • Underlying Strategy: • First ascertain the key meteorological feature(s), • Then incorporate different model and ensemble solutions accordingly, weighting as appropriate (on screen or on paper) to arrive at a consensus solution

  11. Operational Model Errors NH rms MSLP error vs Lead Time 15days 10 short range | medium range | trend period |

  12. Simple Example to Illustrate • Cold front is the • main feature • Consensus would • move GM front south, • possibly hinting at • wave development, • as GM underdoes • waves, and as NCEP • shows one.

  13. Modifying a Selected Model Run • Use Field Modification tool (devised by Eddy Carroll) AFTER a model run has finished • Allows quick, interactive, dynamically consistent changes to be made to a set of 3-d fields from one model run, eg: • Move low or front • Deepen/fill low • Introduce low or wave… • Relies on modification vectors applied to PV distribution, followed by PV inversion with changed boundary conditions • Equivalent translation vectors applied to ppn and RH; simple boundary layer model used for surface winds • Temporal consistency achieved via time-linking (with ‘decay’ parameter) • Precipitation rate & type, winds etc can also be adjusted directly and time-linked

  14. Field Modification Example –moving a low with slight deepening

  15. Resulting fields (takes ~2 seconds)

  16. Initial Fields

  17. 500mb ht and 100-500mb Thickness - before

  18. 500mb ht and 100-500mb Thickness - after

  19. Objective Verification

  20. Subjective Verification • Met Office Global model, ECMWF Oper and issued Modified forecasts are compared, primarily for mslp, but also for fronts and thickness, over NW Europe, using 12Z data times, for T+48,72, 96 and 120h • The overall ranking is (best first): • Modified >> ECMWF >> UKMO • This is despite the objectively calculated lead time gain of ECMWF over UKMO (10-16 hours) being generally greater than it is for Modified over UKMO (0-12 hours) • Objective schemes can penalise good forecasts of cyclogenesis (especially rms errors) • A new ‘more discriminating’ subjective verification scheme will be introduced this year

  21. Modification Time Forecaster Impact

  22. Probabilistic component • Consists of a headline summary of probabilities of severe weather, in a number of categories (introduced relatively recently) • Minima and maxima for sites are issued with upper and lower bounds. Probabilities are given for rainfall total exceedance. Starting point is calibrated ECMWF ensemble output. • ‘Alternative scenarios’ can be issued to highlight uncertainties • Probabilistic components appear to be used far less by customers than the deterministic component. Somewhat disappointing – education required, but may take a long time.

  23. 3. Trend Forecast • Consists of an issued worded forecast, with expected temperature anomalies, and considerable discussion of uncertainties, highlighting possible severe weather • Based primarily on ECMWF data, but with some input from other models and ensembles, notably from NCEP • Customer base for this forecast has been dwindling (perhaps they watch Swedish TV)

  24. Trend Period – Subjective Verification • Based primarily on mslp, over NW Europe, ECMWF only • Ensemble mean rated a little more useful than Oper run, but not by much • Only 1 in 5 forecasts for days 6 and 7 were considered useful, and 1 in 10 forecasts for days 8, 9 and10 • Scores have not changed a great deal over the years

  25. Extras for ‘Wish List’ • Meteograms to include overlapping24-hour rainfall totals (but still in 6 hour blocks) • Total cloud cover – is this ‘altitude weighted’, or is 8 oktas cirrus considered ‘cloudy’? Weighting would be preferable • Postage stamps showing estimated surface gusts, with colour-shading for high values • Cluster ensemble means for mslp, thickness, annotated with percentages of members

  26. 4. Verification – some ideas • Conceptually there should be a ‘deterministic limit’ for predicting a pre-defined meteorologicalevent • Simply defined this could be the point in lead time beyond which forecasts concerning that event are more likely, on average, to be wrong than right • Defined in this way, this provides some guidance on when to shift the emphasis, in forecasts for particular events, towards the probabilistic • For rare events at least, correct null forecasts – ie the majority - can be ignored as not relevant

  27. Ob   a b  Fc c d  ‘deterministic limit’ Verification ideas (contd) • The ‘deterministic limit’ for the event in question is then simply the lead time at which, over a suitably large forecast sample, hits equals the sum of misses and false alarms (orCSI = 0.5) misses + false alarms number hits lead time a/(b+c) = 1

  28. Event Examples (numbers are very crude estimates) • Tornado within 2km radius (deterministic limit ~ 5 mins) • Snow falling at a point (~5 hours) • Rain falling at a point (~18 hours) • Gale force gusts at a point (~6 hours) • Gale force gusts within a UK county (~24 hours) • Rainfall >15mm in 3 hours somewhere in a UK county (2 hours) • Cyclonic surface pressure pattern at a point (~120 hours) • Atmospheric front within 200km of a point (~60 hours) • Day with maximum above 30C in London (~96 hours)

  29. Benefits • Potential to provide a meaningful measure of what to expect from, and therefore what to put into, a forecast. Too many forecast elements are deterministic. • It is something that the public, other customers (and auditors!) could potentially relate to • The equivalent, from an idealised, reliable ensemble prediction system, would be the lead time at which the average probability, for hindcasts of observed past events, fell to 50% (?) • As always extreme events would be more difficult to represent (though hindcasts from re-analyses are becoming increasingly tractable) • Facility also to measure forecast improvements, compare systems, assess forecaster performance

  30. Summary • The Met Office makes extensive use of ECMWF products for forecasts from T+48 to T+240, and is increasingly using the operational run as an input to short range forecasts • Verification indicates that the forecaster is adding value in many areas, in part using the poor man’s ensemble approach, though some weaknesses remain • Various enhancements to ECMWF web-based output have been suggested • Disappointingly, the customer base for probabilistic forecasts is currently limited • More guidance on what we can and cannot forecast deterministically is required • A new measure of ‘deterministic limit’ has been tentatively proposed

  31. References • Carroll, Meteorological Applications, 1997, for field modification description • Carroll and Hewson, Weather and Forecasting, 2005 (out shortly) for ops centre practice and verification

  32. WAFC World Area Forecast Centre Accreditation

More Related