1 / 7

R2E Review – Introduction to Session 1 – Calculations & Monitoring R2E Review 2011

R2E Review – Introduction to Session 1 – Calculations & Monitoring R2E Review 2011. M. Calviani (EN/STI) for the R2E Project. Agenda. RadMons. RadMon calibration ( J. Mekki – EN/STI ) How RadMon are calibrated Accuracy/uncertainties Calibration improvements

shira
Télécharger la présentation

R2E Review – Introduction to Session 1 – Calculations & Monitoring R2E Review 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R2E Review – Introduction to Session 1 – Calculations & MonitoringR2E Review 2011 M. Calviani (EN/STI) for the R2E Project

  2. Agenda M. Calviani - R2E Review - Introduction Session 1

  3. RadMons • RadMon calibration (J. Mekki – EN/STI) • How RadMon are calibrated • Accuracy/uncertainties • Calibration improvements • RadMon generalities and installation (G. Spiezia – EN/STI) • RadMon types and location in the LHC underground areas • Requirements and possible changes M. Calviani - R2E Review - Introduction Session 1

  4. LHC– radiation and observation • Additional (R2E-related) weak points (M. Calviani – EN/STI) • P4 LSS/UX45 beam-gas levels • P6 UX65 beam-gas levels – monitoring results • DS/ARC and operation with 25ns bunch spacing • UX/UL junction weak-point • LHC operational perspectives (M. Lamont – BE/OP) • Main question for 2012 operation • 25ns scrubbing? • Target luminosities for 2012 and beyond • Vacuum evolution 2011/2012/LS1 (V. Baglin – TE/VSC) • Vacuum behaviour during 50 ns operation • Expected and measured pressure during 25 ns MDs in 2011 • Expected scrubbing periods during 2012 • Confirmation of pressure values in DS/ARC during operation • Beam-gas radiation levels in FLUKA (R. Versaci – EN/STI) • FLUKA dose prediction in ARC and comparison with BLM data • Results of the 25ns MD M. Calviani - R2E Review - Introduction Session 1

  5. Collimation behaviour • Collimation losses as seen from BLM (A. Nordt – BE/BI) • Loss distribution between IR3/7 from BLM • Behaviour of losses within primary and secondary in IR7 • (Cumulated dose P4/P6) • Expectation from the collimation team (A. Rossi – BE/ABP) • Loads on collimators • Foreseen sharing between IR3/7 and ollimators during a fill • Long-term loss/assumption for collimation • Effect of new collimators in IR2/8 • Phase-II? M. Calviani - R2E Review - Introduction Session 1

  6. Simulations • P1/5 cross-check and R-factor evaluation (C. Adorisio – DGS/RP) • Cross-check of PATs and RadMons in UJ14/16 • R-factor gradient and comparison with RadMon extracted data with realistic equipment • Sensitivity of IG5 chamber with respect to thermal neutrons • P1 RR advanced shielding options (R. Kwee – EN/STI) • What we might gain after the LS1 and what are possible solutions for the RRs M. Calviani - R2E Review - Introduction Session 1

  7. Radiation levels • LHC SEU-related radiation levels (M. Calviani – EN/STI) • Summary of 2011 operation • Perspective for 2012 operation and for nominal configuration • Overview of known critical areas as well as other zone shown to be sensitive during 2011 operation • Review of levels for DS/ARC based on 2011 vacuum observations • Design study for a PS East Area irradiation facility (E. Lebbos – EN/STI) • First generic calculation for a future new irradiation facility in the East Area • Particle spectra and RP aspects M. Calviani - R2E Review - Introduction Session 1

More Related