1 / 10

Instrument Status

Instrument Status. On/Off Cycle: 26 Hours On: ~56,000 hours Continuous operations since 1/15/2005 (probe relay) HDAC Filament Modulation: Filament 1: 100.28 hours Filament 2: 12.22 hours Last: 2006/255. FSW Status. No Changes since last meeting Old ISA ISA Z70771

shirleyy
Télécharger la présentation

Instrument Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Instrument Status • On/Off Cycle: 26 • Hours On: ~56,000 hours • Continuous operations since 1/15/2005 (probe relay) • HDAC Filament Modulation: • Filament 1: 100.28 hours • Filament 2: 12.22 hours • Last: 2006/255 UVIS TEAM MEETING 1/2007

  2. FSW Status • No Changes since last meeting • Old ISA • ISA Z70771 • Fixed by FSW patch in C24 • Fixed by FSW V1.3 starting C31 • ISA Z86939 (bad EUV data in S11 icylon) • Probably FSW problem • Workaround by updating the instrument setup • That is if we don’t forget to use the updated setup (UVIS_026RH_STARE001_PRIME) UVIS TEAM MEETING 1/2007

  3. GSW Issues • Problem with HSP data set • Duplication of the first record when the data set was created due to data loss • Data has been re-ingested • Time error in DAPS metadata (start time) • Caused by the correct clock kernel not being ingested • Time information has been re-written UVIS TEAM MEETING 1/2007

  4. Operational Issues • UVIS_026ST_ALPVIR002_PRIME (T16) • Incorrect pointing dead band requested • (2.0, 2.0, 2.0) vs (0.5, 0.5, 0.5) • Check has been added to our checklist • ISA Z89032 UVIS TEAM MEETING 1/2007

  5. Planning/Sequencing Issues • No DSN allocation until late in the sequence development • No sponge bit • It is difficult for us to participate to the R/T sponge bit • S27 may be the first time we will be able to do some of it • RBOT analysis • JPL is trying to minimize the time the RW are under 300 rpm • Late pointing design modification • S27: UVIS_037ST_UREPSLUP001_PRIME - Added +20 degree rotation around Y axis • S28: UVIS_040ST_URTHEARA001_PRIME - Added a +70 degree rotation around Y axis UVIS TEAM MEETING 1/2007

  6. Data Corruption (ISA Z89728) • First reported on 2006/336 • Probably caused by 1 to 4 faulty sub modules on SSR-A • Consequences: • Corrupted packet header (JPL and instruments can filter that via ground processing) => data gap • Corrupted science header => data gap • Has caused the L0 processing software to crash • May be able to filter that via ground processing. • Corrupted science data • Impossible to filter during L0 processing • Trying to query JPL database around time of data corruption • Not always successful. UVIS TEAM MEETING 1/2007

  7. Example of corrupted data • UVIS_034RI_0PHASE001_VIMS: record #3 UVIS TEAM MEETING 1/2007

  8. Example of corrupted data • UVIS_034RI_0PHASE001_VIMS: record #4 UVIS TEAM MEETING 1/2007

  9. Data Corruption • Working around the corrupted data • Time consuming • Trial and error • Example: UVIS_036RF_FMOVIE001_VIMS • Data from 2007-005T23:31:41 to 2007-005T23:56:41 was not ingested. UVIS TEAM MEETING 1/2007

  10. Notes on DAPS IDL routines • You should use the ICY version of convert_sclk.pro • Make sure that you use the last clock kernel (cas00102.tsc) • If you need to use the old version of convert_sclk.pro it is up to date on the UVIS team site under the name of old_convert_sclk.pro (“version 1.2” appears on the header of the file) UVIS TEAM MEETING 1/2007

More Related