1 / 8

Generator Interconnection Status Update Tom Lanigan

Generator Interconnection Status Update Tom Lanigan. Entergy Transmission Planning Summit New Orleans, LA July 10, 2003. Proposed Generation Under Study or Construction in the Entergy Area. Arkansas 9,160 MW 9 Studies. Mississippi 7,170 MW 12 Studies. Texas 4,553 MW 9 Studies.

signa
Télécharger la présentation

Generator Interconnection Status Update Tom Lanigan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Generator Interconnection Status UpdateTom Lanigan Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

  2. Proposed Generation Under Study or Construction in the Entergy Area Arkansas 9,160 MW 9 Studies Mississippi 7,170 MW 12 Studies Texas 4,553 MW 9 Studies Louisiana 14,617 MW 32 Studies Total Generation 35,500 MW (1) Total Number of Studies 62 (2) (1) Total generation does not include cancelled studies. (2) This number reflects only the active studies/projects and does not include cancelled studies or duplicate studies for the same project.

  3. Transmission Interconnection Study Requests Study Status Completed 103 (1) Cancelled 112 (1) On Hold 1 In Progress 0 In the Queue 6 (1) Includes 27 studies that cancelled after the completion of detailed interconnection studies and 11 that cancelled after filing an Interconnection and Operating Agreement.

  4. Merchant Generation with Filed IOAs in the Entergy Area by State State MW # of IOAs AR 7,790 7 MS 6,328 10 LA 8,190 17 TX 2,975 6 TOTAL 25,283 40 Merchant generating facilities with filed IOAs Merchant generating facilities that have filed IOAs and completed construction

  5. Generation Resources in the Entergy Area Entergy Load: ~22,000 MW GENERATION / GENERATION RESOURCES ENTERGY LOAD Entergy ~24,000 1.1 + generation with filed IOAs ~24,000 + 25,283 2.2 + cogen participation* ~24,000 + 25,283 + ~730 2.3 + generation still under study ~24,000 + 25,283 + ~730 + 10,217 2.7 * wholesale or avoided cost

  6. Continuing InterconnectionIssues • Project Cancellations; In-Service Date Deferrals • Classification of Facilities (Interconnection Facilities vs. Network Upgrades) • Coordinating with adjacent systems on interconnection studies

  7. Ozark Northeast Little Rock Southeast Hot Springs Northern Pine Bluff North Central El Dorado West Central East Central Central Southern Western Northshore Gulf Lake Charles Baton Rouge Metro Bayou Transmission Project Development A. Arkansas Jerry Reed 501-490-4703 B. N. Louisiana & Mississippi Rick Bewley 601-368-2005 C. Texas Chuck Hughes 409-347-5118 C. Texas Ronnie Trevino 409-347-5117 D. Lake Charles / N. Louisiana Ed Brawner 337-593-7333 E. Southeast Louisiana Russell Saliba 504-310-5874 Manager: Tom Lanigan 504-310-5866 Note: Geographic boundaries are approximate.

  8. Little Rock Jackson W. Monroe Baton Rouge Beaumont New Orleans Transmission Services A. Arkansas, N. Mississippi Mike Doyle (501) 490-5643 B. N. Louisiana, S. Mississippi, S. Louisiana Gerald Gibson (504) 310-5867 C. Texas Carl Olson (936) 525-2040 D. SW Louisiana IPPs & Cogens Carl Olson LaGen Coops Gerald Gibson Interconnection Coordinator: Dennis Broussard (504) 310-5878 Sr. Wholesale Exec.: James Howard (504) 310-5881 Analyst: Kim Mitchell (504) 310-5879 Manager: Ollie Burke (504) 310-5864 Note: Geographic boundaries are approximate.