TXU Power

…And Developed The TXU Operating System To Implement Lean Principles In Generation. 24. 21. 18. 1. Technical system. 2. Learning/ capability building system. 3. Behavior/ culture alignment system. 4. Performance management system. Gas (10.2 GW). 15. 12.

sitara
Télécharger la présentation

TXU Power

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. …And Developed The TXU Operating System To Implement Lean Principles In Generation 24 21 18 • 1. Technical system • 2. Learning/ capability building system • 3. Behavior/ culture alignment system • 4. Performance • management • system Gas (10.2 GW) 15 12 TXU Power: Well Mixed; Scaled Position;Strong Fundamentals Lignite (5.8 GW) Nuclear (2.3 GW) 9 • Strategy/ • aspiration • Frontline execution 6 • TXU units 3 10 20 30 40 50 60 70 80 ERCOT full load average implied heat rate 04; MMBtu/MWh Large portfolio 03; TWh of deregulated generation Gas fleet provides shaping and ancillary services • 152 Solid fuel capacity provides low cost baseload power “What to do” “How to do it” “Why do it” “Accountability” “Actions” • 73 • 63 • 52 • 50 • 48 • 48 • 45 • Key • changes: • Standardize best practices • Apply Lean, RCM, etc. • Standard problem- solving methodology • Build internal capability and replicability (e.g., Academy) • Drive performance culture down to frontline • Institute a meritocracy model • Focus on value drivers • Create line of sight metrics • Hold managers accountable for stretch targets • Build a program that delivers sustainable productivity gains year after year • 41 • 40 EXC TXU CPN PPL CEG PEG EIX CNP RRI FE Source: Platts Cumulative GWs Robust wholesale prices 04; $ per MWh for 24X7 wholesale prices NYMEX Henry Hub calendar strip gas prices 02-04; $/MMBtu 6 $2-3 increase 58 49 44 43 5 41 37 37 36 33 4 06 05 04 3 NPCC MAAC MAPP SPP ECAR FRCC ERCOT SERC MAIN 1 2 Source: Platts 3 4 TXU Power We Have Learned From The Pioneers Of Productivity… Profile Robust systems & problem solving Very visual & efficient production processes Excited & involved workforce Managed by performance Common production language & tools Key Success Factors …Which Will Drive Both Cost Leadership and Operational Excellence… EBIT improvement relative to 04E 05-07; $ millions • 235 • Cost leadership initiatives • Coal and nuclear O&M • Strategic sourcing • Employee benefit expenses • Contractor management • Maintenance efficiency • 180 • 2 • 125 • Cost Leadership • 1 • Operational excellence initiatives • Nuclear capacity factor • Coal capacity factor • Heat rate improvement • 2 • Operational Excellence • 1 1 Excludes impact of dual nuclear outage 2 Excludes impact of steam generator replacement

  2. …Through Many Initiatives, Like Heat Rate Improvement… …Maintenance Efficiency… Tool time 04; Percent of total time Martin Lake Heat Rate 04; Btu/KWh • Non-value added time • Incidental time • Value-added time • Waiting on clearance • Excess break time • World-class = 60% 2-3% • Failure to use transportation (e.g., bicycle) • Observation for a planned and scheduled job during day shift • Wrong part number on work order • Gasket out of stock Currentheat rate Cycle isolation HP/LP turbine seals Air pre- heaterseals Throttled steam to De-aerator Air in leakage Con-denser back pressure Operator control para-meters Target heat rate • Total time • Waiting time • Search for materials/ tools • Walking to/from job site • Discuss job specifics • Rework • Transport (driving tools to job) • Tool time1 • Identified opportunities to improve plant heat rate by 2-3% • Heat rate improvement translates to $5 million annual EBIT opportunity Maintenance efficiency can be a $15 million EBIT opportunity 5 6 1 Tool time defined as value-added portion of activity (i.e., on tools fixing it right the first time) • Operational EPS03-05; $ per share • EBITDA103-05; $ millions 211% 51% • 03 • 04E • 05E • 03 • 04E • 05E 7 8 1 Results are from continuing operations excluding special items TXU Power …And Increased Capacity Utilization… …Which Will Improve Power’s Financial Performance Operator performance 04; Average MW achieved Relief Operator Primary Operator x x • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 1 • Operator Through best practice sharing between operators, average capacity has increased by 9 MW, corresponding to a $3 million EBIT opportunity 1 Excludes all conditions out of the operator’s control (e.g., equipment failures, low Btu fuel)

More Related