STUDIEDAG PASSIEF BOUWEN OPROEP TOT KANDIDATEN 29 MEI 2007

STUDIEDAG PASSIEF BOUWEN OPROEP TOT KANDIDATEN 29 MEI 2007. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD. VOORSTEL. • MINIMUM VIER VOORBEELDPROJECTEN PASSIEFSCHOLEN • MEERKOSTEN OP BASIS VAN FORFAITAIR BEDRAG PER M2 • DIE MEERKOSTEN WORDEN 100% VERGOED

Télécharger la présentation

STUDIEDAG PASSIEF BOUWEN OPROEP TOT KANDIDATEN 29 MEI 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STUDIEDAG PASSIEF BOUWEN OPROEP TOT KANDIDATEN 29 MEI 2007

  2. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD VOORSTEL • MINIMUM VIER VOORBEELDPROJECTEN PASSIEFSCHOLEN • MEERKOSTEN OP BASIS VAN FORFAITAIR BEDRAG PER M2 • DIE MEERKOSTEN WORDEN 100% VERGOED • SELECTIE EN RANGSCHIKKING DOOR DE DBFM-SELECTIECOMMISSIE • CRITERIA: SNELLE REALISATIE, OPENSTELLEN PROJECT VOOR DERDEN, REPRESENTATIVITEIT,OPVOLGING EN TOTAALVISIE DUURZAAMHEID

  3. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD HOE KAN JE EEN AANVRAAG INDIENEN? VIA SCHOOLDIRECT:•OPROEP TOT KANDIDAATSTELLING MET VERWIJZING NAAR DE WEBSITE VAN AGION: WWW.AGION.BE VIA AGION:•MOGELIJKHEID TOT HET DOWNLOADEN VAN EENINVULFORMULIER•INGEVULD FORMULIER TE VERSTUREN NAAR HET SECRETARIAAT VAN DE SELECTIECOMMISSIE : PASSIEFBOUW@AGION.BE •INSCHRIJVEN KAN TOT: VRIJDAG 28 SEPTEMBER 2007

  4. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD WIE KAN EEN AANVRAAG INDIENEN? •ALLE ONDERWIJSNETTEN •ALLE ONDERWIJSNIVEAUS BEHALVE HET HOGER ONDERWIJS •INTERNATEN •CENTRA VOOR LEERLINGENBEGELEIDING

  5. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD WELKE PROJECTEN KOMEN IN AANMERKING? •PROJECTEN OP DE WACHTLIJST AGION •REEDS GOEDGEKEURDE AGION - PROJECTEN •GESELECTEERDE DBFM-PROJECTEN •TOTAAL NIEUWE PROJECTEN

  6. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD SELECTIECOMMISSIE •DE DBFM- SELECTIECOMMISSIE KRIJGT DE OPDRACHT OM DE INGEDIENDE VOORSTELLEN TE BEOORDELEN. •DE SELECTIECOMMISSIE BRENGT EEN ADVIES UIT AAN DE VLAAMSE REGERING •VLAAMSE REGERING BESLIST WELKE PROJECTEN GEREALISEERD WORDEN

  7. SCHOLEN VOLGENS DE PASSIEFHUISSTANDAARD SELECTIECRITERIA • DE HIERNAVOLGENDE 5 CRITERIA STAAN OP GELIJKE VOET VAN BELANGRIJKHEID: • ZICHT OP EEN SNELLE REALISATIE • OPENSTAAN VOOR BEZICHTIGING DOOR ANDERE INRICHTENDE MACHTEN • REPRESENTATIVITEIT VAN HET BOUWPROJECT • BEREIDHEID TOT PERMANENTE OPVOLGING ENERGIEPRESTATIES • PROJECT MOET DEEL UITMAKEN VAN EEN TOTAALVISIE OP DUURZAAMHEID