1 / 24

IMUTHANE Processing

IMUTHANE Processing. Mobile liquids (2 or more parts) Accurate ratio control needed (ratios range from 1:1 to 3:100) Good mixing Accurate temperature control at all stages Moisture exclusion Good degassing Proper molds and filling techniques Finishing techniques.

sondrav
Télécharger la présentation

IMUTHANE Processing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMUTHANE Processing

  2. Mobile liquids (2 or more parts) Accurate ratio control needed (ratios range from 1:1 to 3:100) Good mixing Accurate temperature control at all stages Moisture exclusion Good degassing Proper molds and filling techniques Finishing techniques Processing of Castable Polyurethane Elastomers – Basic Considerations

  3. Do’s and Don’t’s of Urethane Processing III

  4. Processing – Degassing • Degassing removes dissolved and absorbed gases, from manufacture and those generated through natural aging • Viscosity and surface tension of the prepolymer entrap air and other gases • Degassing of the prepolymer is carried out at the processing temperature: 80 – 100°C • Degassing of the prepolymer is carried out in a vacuum of 28.5” Hg

  5. Processing – Degassing • Degassing is complete when vigorous foaming stops – the time required is dependent on: • the amount of prepolymer • the temperature of the prepolymer • the size and shape of the vessel • the degree of vacuum • the amount of entrapped gases • Use a container that is twice the volume of prepolymer to be degassed to allow for foam rise • It may be necessary to re-heat the prepolymer after degassing because of heat loss

  6. Do’s and Don’t’s of Urethane Processing IV

  7. Processing – Prepolymer Preparation • Refer to Technical Datasheet for specific processing requirements • Heat only the required amount of prepolymer to the processing temperature • Add pigment, anti-foam, other additives • Degas at the processing temperature, usually 80 – 100°C • Reheat to processing temperature if required

  8. Processing – Curative Preparation • Refer to Technical Datasheet for specific processing requirements • Weigh the appropriate amount to cure the prepolymer, allow for residual • Heat to the required processing temperature, if required (e.g. MBCA) • Curative is always added in liquid form to hot prepolymer

  9. Mix Ratio / Stoichiometry • What is Stoichiometry? • It is the ratio of reactive groups in the curative to reactive groups in the prepolymer • It is represented by % Theory • The best mix of properties is found between 95 and 100% Theory • Outside of this range there can be significant impact on the physical properties

  10. Mix Ratio Calculation • %NCO is the weight per cent of reactive isocyanate groups in the prepolymer. It can be found on the drum label or CoA for each batch. • EW is the equivalent weight of the curative. It can be found in the Technical Datasheet. • For GR133.5, EW = 133.5 • For GR107, EW = 107 • Calculation:

  11. Mix Ratio Calculation – Example 1 • IMUTHANE 22-90A cured with GR107 • 22-90A: %NCO = 4.15%. • GR107: EW = 107 • Desired %Theory: 95% • Calculation:

  12. Mix Ratio – Effect on Tensile Strength & Elongation

  13. Mix Ratio – Effect on Tear Strength

  14. Mix Ratio – Effect on Compression Set

  15. Do’s and Don’t’s of Urethane Processing V

  16. Processing – Mixing • Check to ensure correct temperatures before mixing • Mixing can be achieved: • Using a plastic container & spatula • Using a drill with attachment • By machine • Thorough mixing by hand is achieved by scraping the sides and the bottom of the container and using a figure-8 stirring pattern • Mix quickly and thoroughly and avoid entraining bubbles • Pour mixing can cause poor physical properties • Degas after mixing if time permits (hand mixing) • Remember – safety – ventilation, gloves, eye wear, protective clothing

  17. Mixing Issues – Curatives • Curatives like IMUCURE GR107 are Liquid and very easily mixed into prepolymers.

  18. Do’s and Don’t’s of Urethane Processing VI

  19. Processing – Pouring • When the prepolymer and curative are mixed, the mixture is poured into the hot mold for curing • Pouring should be carried out in a way that minimises turbulence and stops bubble entrapment in the mold • Pour evenly and avoid splashing • Other molding techniques include: • Injection • Rotational • Centrifugal • Vacuum

  20. Processing – Temperatures • Material temperature – what does it affect? • Demold hardness and toughness • Cure consistency • Efficiency of production • Efficiency of mixing • Ratio – temperature effects viscosity which can change back pressure in machines, and cause mixing difficulties if hand mixing

  21. Processing – Temperatures • Mold temperature – what does it affect? • Demold hardness and toughness • Cure consistency – incorrect mold temperature causes • Shrinkage • Voids, cracks • Sink marks, “christmas tree effect” • Efficiency of production • Bonding for to metal.

  22. Processing – Molds • Mold temperature – refer to Technical Datasheet for material • Molds should be coated with a release agent to ensure easy removal of cast parts • Take care in handling molds – any damage to surfaces will be reproduced in the polyurethane part • Wide material choice for making molds – steel, aluminium, polyurethane, silicone rubber, … • Mold material must be dimensionally stable, heat resistant and inert to the chemical reaction

  23. Processing – Cure & Post-Cure • Material in the mold must be allowed to cure before demolding – the time required depends on the material and varies from 10 minutes to several hours. • Material is then post-cured, generally for 16 hours at the specified temperature. Time and temperature will depend on the material. • Post-cure is necessary to develop physical properties. • Full property development occurs over the next 7 days at ambient conditions.

More Related