1 / 10

DTMP – National Picture

DTMP – National Picture. Presentation for RAP3. Michael Green. November 2013. DRCN National Picture (2013). Based on a review 31 DTM (40% sample) Existing national DRCN = 21,500km 80% earth 15% gravel 5% blacktop (Terai and KTM Valley) Required national DRCN 30,000km

soo
Télécharger la présentation

DTMP – National Picture

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DTMP – National Picture Presentation for RAP3 Michael Green November 2013

  2. DRCN National Picture (2013) • Based on a review 31 DTM (40% sample) • Existing national DRCN = 21,500km • 80% earth • 15% gravel • 5% blacktop (Terai and KTM Valley) • Required national DRCN 30,000km • A quarter still needs to be built

  3. Village Roads • Existing national VRCN 26,000km • Average per VDC = 7.6km • Well within VDC capacity to manage

  4. VDC Accessibility • 40% national population access via SRN • 37% national population access via DRCN • 23% national population has no access • 836 VDCs nationally have no access (21%)

  5. DRCN Improvement • Gravelling – 12,500 km nationally • Black Top – 3,000 km nationally • Widening – 2,800km nationally • Bridges – 25,400 m nationally

  6. New Construction • 8,000 km nationally • 16,400 m of bridges

  7. Maintenance (Average per district) • Emergency – 289 km • Routine – 289 km • Recurrent blacktop – 14 km • Recurrent gravel – 49 km • Recurrent earthen – 228 km • Periodic blacktop – 14 km • Periodic gravel – 49 km

  8. Costs over 5 years • National costs NRS 206 billion (US$2,060m) • 20% for maintenance of DRCN • 47% for improvement of existing DRCN • 33% for new construction

  9. Budgets • National budget of NRS 68 billion (US$ 680 m) • 50% from GON and 50% from donors • Covers only one third of required funding. • It will take 15-20 years to achieve all weather DRCN

  10. The End Michael Green November 2013

More Related