PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANT’S BASIC OXYGEN FURNACES

PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANT’S BASIC OXYGEN FURNACES. OBJECTIVES. HELP REDUCE PROCESSING TIME MONITOR PROCESS IN REAL-TIME HELP INCREASE IN PRODUCTIVITY ACHIEVE ‘C’ / TEMP. HIT RATE % MANAGEMENT INFORMATION SYSTEM ENSURE QUALITY OF PRODUCT. AUTOMATION LEVELS.

sorley
Télécharger la présentation

PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANT’S BASIC OXYGEN FURNACES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANT’SBASIC OXYGEN FURNACES

  2. OBJECTIVES • HELP REDUCE PROCESSING TIME • MONITOR PROCESS IN REAL-TIME • HELP INCREASE IN PRODUCTIVITY • ACHIEVE ‘C’ / TEMP. HIT RATE % • MANAGEMENT INFORMATION SYSTEM • ENSURE QUALITY OF PRODUCT

  3. AUTOMATION LEVELS • LEVEL 0 - FIELD INSTRUMENTS /SENSORS CAPTURING ANALOG AND DIGITAL DATA. • LEVEL 1 - BASIC AUTOMATION SYSTEM HAVING A SUPERLOOP OF TWISTED PAIR CABLE CONNECTING PCUs, WSAs , CIUs. • LEVEL 2 - VAX 3300 SYSTEMS ONE FOR EACH CONVERTER; CONNECTED TO CIUs OF LEVEL 1 & COLLECT DATA FROM LEVEL 1 AND PASS SET POINTS. • LEVEL 3 - VAX 3800 CLUSTER CONNECTED TO LEVEL 2.

  4. LEVEL I - LEVEL II - LEVEL III COMMUNICATION RS-232 DECNET VAX (L3) VAX (L2) CIU (L1) NETWORK 90 SUPERLOOP WSA (SUPERVISORY) PCUs (22) FIELD ( I/O) • DISPLAYS • SEND COMMANDS TO PLSs • CHANGE SET POINTS, NODE ETC. • OPERATOR -> BULK MATERIAL ADDITION

  5. SMS HARDWARE • MicroVAX 3800 Cluster - 2 M/Cs called Level 3 Systems • MicroVAX 3300 Computers - 4 M/Cs , 1 for each Converter and 1 for VAD • MicroVAX 3100 - for BOF Lab • Cluster Monitor • 8 Terminal Servers, 2 Repeaters, 500 m Fiber Optic Line • DEC Router, 45 Terminals and 20+ printers including 1 Laser printer, 1 Plotter and 1 Line printer • Connections to Control Room and Blower desks at 9M, VAD,LDS,LTS, CCP, Mixer Bay, Scrap Yard, Welfare Building, LAB • Commissioned by DEMAG (Germany)

  6. SYSTEM SOFTWARE • OPEN VMS 5.5-2 • VAX FORTRAN, DECNET, DECFORMS, GKS, TCP/IP, ORACLE RDB, VOLSHAD, CLUSTER MONITOR • MODAS ( Case Tool ) APPLICATION SOFTWARE • DIALOG BASED & BACKGROUND PROGRAMS • L II CONVERTER SPECIFIC SOFTWARE • L II TEE,CCP,LTS,VAD SPECIFIC SOFTWARE • L III ( Scheduling, Tracking ) • L II TO L III AND L III TO LIV COMMUNICATION S/W

  7. INFORMATION FLOW BETWEEN DIFFERENT LEVELS AT S.M.S DURGAPUR STEEL PLANT Level 1 to Level 2 Level 2 to Level 1 • Heat status e.g., HS,BS,TS,TE • Each heat’s data like bulk material addition, temps, lance position. Co/co2 at tap end • Converter activities as seen in event log • Mode of converter operation • Set point passing for o2 and bulk materials after metallurgical calculations like : • * Process aim, hot metal orderingmain & 2nd blow calculation, end blow & alloying additions Teeming Reports Heat Reports Level 3 to Level 2 Graphic Printouts Level 2 to Level 3 * Heat Number * Heat Data * Heat Status * Steel/Hot Metal/Slag Analysis * CCP/LTS, Teeming Data * Scrap Yard/ Mixer Data • Schedule/Plan for the day • Ladle details • Grade Specifications / Definitions • Actual Steel Grades Query Reports M.I.S. Reports Level 4 to Level 3 Level 3 to Level 4 * Heat Number * Teeming /CCP Cast Data * Heat Data * Steel/H.Metal/Slag Analysis Data * Backlog details of the above, if any. • Schedule Data • Actual grades of cast from laboratory Level 4 terminal

  8. Level 2 System Tasks • Heat Number Generation • Metallurgical Calculations • Heat status monitoring • Select Mode of operation • Analysis data entry from Lab • Event log generation • Data transfer <-> Level 3 Systems

  9. Level 3 System Tasks • Heat Tracking • Ladle Tracking • Shop Scheduling • Grade definitions • Data Transfer to PPCS • Database Upkeep • Software development

  10. Level 2

  11. Level 2 Models • Process Aim calculation • Hot Metal /Scrap Ordering • Blowing Calculation • 2nd Blow Calculation • Reblow Calculation • Alloying Calculation • Feedback Calculation

  12. Process aim calculation • It is a feasibility check • It reads grades and re-blow pattern • The model predicts aim Carbon percentage and the temperature of liquid steel at the end of blow

  13. PIC 60 DISPLAY PROCESS AIM CALCULATION 15-JAN-03 11:16:24 HEAT NO. 02311369 STEEL GRADE R16 AXLE STEEL CHARGE ID 23631 PETRO COKE N

  14. Hot metal and scrap ordering calculation • Hot metal, scrap or iron ore can be fixed • Mixer and ladle number are a must • Bulk materials are calculated • Download order to mixer and scrap yard bay • Basicity can be adjusted

  15. PIC 61 DISPLAY HOT METAL AND SCRAP ORDERING CALCULATION 15-JAN-03 11:20:24 HEAT NO. 02311369 STEEL GRADE R16 AXLE STEEL CHARGE ID 23631

  16. Main blow calculation • Done after start of heat • Actual hot metal weight and temperatures are given as input to the model • Model advices oxygen amount to be blown ( 1st blow ) • It also outputs expected steel composition at endpoint and slag weight

  17. PIC 62 DISPLAY MAIN BLOW CALCULATION 15-JAN-03 11:38:24 HEAT NO. 02311369 STEEL GRADE R16 AXLE STEEL CHARGE ID 23631

  18. Second / Re-blow calculation • After taking sample and temperature during first blow, this calculation can be done • Model advices oxygen amount and bulk material additions/coolants • Expected end values • Re-blow is necessary if percentage of Carbon is too high, slag is too viscous

  19. PIC 63 DISPLAY SECOND BLOW AND REBLOW CALCULATION 15-JAN-03 11:38:24 HEAT NO. 02311369 STEEL GRADE R16 AXLE STEEL CHARGE ID 23631 ACTUAL PROCESS STATUS MAIN BLOWING 2 NUM OF REBLOWS 0

  20. Offline alloying calculation • Done before Tap Start • This model advices three different combinations of alloys • C , SiMn, FeSi, FeMn are calculated

  21. PIC 66 DISPLAY OFFLINE ALLOYING ADVICE 15-JAN-03 12:09:23 HEAT NO.: 02311369 CHARGE ID : 23631 EXP. STEEL WT.: 127.0 LADLE ANALYSIS : C Mn Si P S C LOSS AIM: 0.200 0.600 0.080 0.040 0.030 10.00 ACTUAL 0.028 0.012 0.050 0.005 0.031 COST (1) – RS 30902.0 COST (2) – RS 0.0 COST (3) – RS 38566.2 ELEMENT C SI-FESI MN-FEMN SI-SIMN MN-SIMN YIELD : 45 65 85 65 85

  22. Level II VCS System • This system is significant after tap end • This system has data entry and monitoring screens for • LADLE TREATMENT STATION • CONTINIOUS CASTING PLANT • TEEMING BAYS • LADLE DESPATCHER • PRODUCTION DATA ENTRY SCREENS OF TEEMING AND CONTINIOUS CASTING PLANT

  23. Level 3

  24. Level 3 Models • Heat Tracking In Shop • Heat Scheduling • Ladle Tracking • Ladle Overview • Data Storage • Data Transfer To Level 4 PPC System

  25. Production status of steel shop • Shows the status of last 10 heats • One can know the heat number, status, area, start / end times.

  26. DIALOG 23 DISPLAY PRODUCTION STATUS STEEL SHOP 01-JAN-03 10:19:51 HEAT NO. CHID LDL ST CONVERTER TRANS SECONDARY TRANS CASTING 02110767 22951 14 CE BOF–1 04:36 TEA-06:00 05:18 06:51 02310768 22952 08 CE BOF-3 05:02 TEA-4 07:09 05:45 07:50 02110769 22949 18 CE BOF-1 05:21 LTS-2 06:42 CCM-1 06:51 06:15 06:44 08:12 02310770 22939 17 CE BOF-3 05:47 LTS-1 06:53 CCM-2 07:03 05:45 07:00 09:00 02110771 22942 02 HS BOF-1 06:17 02310772 22943 01 BS BOF-1 05:55

  27. Heat schedule • Shows the planning of the shop • Heat status, grade, route code • Start / end time of different areas

  28. PIC 5O DISPLAY HEAT SCHEDULE - SSC 01-JAN-03 10:27:24 BDVLCT

  29. Ladle tracking and Ladle data • Shows a map like view of positions of ladles in the entire steel shop • Ladle placement times are captured • Temperatures/times at various points like preheating, porous plug in/out, gate preparation start/end are captured • Status, location, last cast end, tap start, reference details, life of PP,WB,In,On etcetera

  30. PIC 99/1 (2) LADLE STATUS 01-JAN-03 10:27:24 VAD BOF –1 BOF - 2 BOF - 3 HEAT AND LADLE > SCHED. END > NEXT PROC. AREA > NUMBER ST VD HM IN USE 4 AT LPB 15 8 EXT MT 1 6 INJ PARK 04 06 11 13 21 25 TEA - 4 TEA- 3 TEA–2 TEA - 1 DRYER TEA –5 PARK 05 19 26 CSTF 07 08 14

  31. Ladle overview • Shows the ladle status / position in the shop • One can know the ladle number, status, area and time of placement • Current Heat Number attached with a ladle is displayed

  32. PIC 72 DISPLAY STEEL LADLE OVERVIEW 01-JAN-03 10:27:24

  33. Level 3 To Level 4 Data Flow L E V E L 3 L E V E L 4 HEATDATA CASTDATA ANALYSIS DATA GRADE LIST BILLET DATA

  34. Level 4

  35. Level 4 PPC Modules • Production and Planning • Commercial Module • Data Warehousing and Shipping • Manufacturing Module • Quality Assurance Module

  36. Thank You