1 / 1

Page 1 of 1

Engineering & Construction Management Department. May Report, 2011. Gran Cima Street & Drainage Improvements.

starbuck
Télécharger la présentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department May Report, 2011 Gran Cima Street & Drainage Improvements General Project Description: Project located on Gran Cima between Ashwood and Cumbre Negra. Project consist of wedge milling existing asphalt and resurfacing street, installation of 2 drop inlets , ADA driveways, street signage and street lights. PROJECT SCHEDULE Design Status: Design Complete Pending Issues: Bid Opening Overall Project Budget (includes approved project development, design and construction costs): $232,170.00 Funding Source(s): CDBG 36th Year Project Contact Project Manager: Ziad Al-Dasouqi 541-4200 Design Consultant: In-House Design Page 1 of 1

More Related