KOORDINIRANO PLANIRANJE RAZVOJA PRIJENOSNE MREŽE U JUOGISTOČNOJ EUROPI

KOORDINIRANO PLANIRANJE RAZVOJA PRIJENOSNE MREŽE U JUOGISTOČNOJ EUROPI. Dr.sc.Goran Majstrović Dr.sc.Davor Bajs Doc.dr.sc.Nijaz Dizdarević ENERGETSKI INSTITUT Hrvoje Požar Zagreb. Savjetovanje crnogorskog ogranka CIGRE Pržno, 12.-16.10.2009. SADRŽAJ. 1. Motivacija

stew
Télécharger la présentation

KOORDINIRANO PLANIRANJE RAZVOJA PRIJENOSNE MREŽE U JUOGISTOČNOJ EUROPI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KOORDINIRANO PLANIRANJE RAZVOJA PRIJENOSNE MREŽE U JUOGISTOČNOJ EUROPI Dr.sc.Goran Majstrović Dr.sc.Davor Bajs Doc.dr.sc.Nijaz Dizdarević ENERGETSKI INSTITUT Hrvoje Požar Zagreb • Savjetovanje crnogorskog ogranka CIGRE • Pržno, 12.-16.10.2009.

  2. SADRŽAJ 1. Motivacija 2. Kronologija koordiniranih aktivnosti u regiji 3. Struktura proizvodnih kompanija u regiji 4. Plan izgradnje proizvodnih objekata u regiji 5. Postojeće i planirane interkonekcije u regiji 6. Zagušenja u prijenosnoj mreži 7. Zaključak • Savjetovanje crnogorskog ogranka CIGRE • Pržno, 12.-16.10.2009.

  3. MOTIVACIJA • Svaki TSO u regiji samostalno priprema vlastite planove razvoja prijenosne mreže. • Pri tom se pitanja povezivanja susjednih sistema zajednički bilateralno obrađuju. • Zbog nepovoljnog naslijeđa u regiji tek nedavno je započeto sa širim regionalnim koordiniranim aktivnostima na planiranju razvoja EES.

  4. MOTIVACIJA • U tom smislu je značajan iskorak učinjen u području prijenosa. • Određene analize provedene su i u području proizvodnje i potrošnje električne energije. • Uspostavljanjem Energetske zajednice 2005. države regije i formalno su se obavezale formirati jedinstveni pravni okvir za organiravanje zajedničkog energetskog tržišta sa zemljama EU, pri čemu su sve države dužne provoditi relevantnu pravnu stečevinu EU.

  5. 2001: Pod pokroviteljstvom USAID-a u okviru SECIRegional Transmission Planning Project – 10 TSO+EIHP+EKC[1] PSS/E programski paket i obuka, 2001-2002 [2] zajednička priprema modela EES i razmjena podataka, 2002-danas[3] Study on Regional Transmission Planning Project in South East Europe, SECI TSP, 2002[4] Generation Investment Study - Transmission:, REBIS-GIS, EIHP, EKC, 2004[5] Transmission Network Investment Criteria, EIHP, EKC, 2007[6] Evaluation of Investments in Transmission Network to Sustain Generation and Market Development in SEE, EIHP, EKC, 2007[7] Uncertainties in Transmission Planning, EIHP, EKC, 2009[*] SEE Regional Energy Demand Planing Project, IRG, 2008... KRONOLOGIJA SURADNJE U REGIONALNOM PLANIRANJU PRIJENOSNE MREŽE

  6. STRUKTURA PROIZVODNIH KOMPANIJA U REGIJI

  7. PLAN IZGRADNJE NOVIH PROIZVODNIH OBJEKATA

  8. POSTOJEĆI INTERKONEKTIVNI VODOVI U REGIJI

  9. PLANIRANI INTERKONEKTIVNI VODOVI U REGIJI KS

  10. RANGIRANJE PLANIRANIH INTERKONEKTIVNIH VODOVI U REGIJI • Kriteriji za rangiranje važnosti pojedinih interkonektivnih vodova – kandidata za izgradnju su: • broj otklonjenih ili uzrokovanih zagušenja (pri • raspoloživosti svih n elemenata mreže), • broj otklonjenih ili uzrokovanih kritičnih ispada (pri n-1 • raspoloživosti), • broj otklonjenih ili uzrokovanih nezadovoljenja naponskih • prilika. • Savjetovanje crnogorskog ogranka CIGRE • Pržno, 12.-16.10.2009.

  11. RANGIRANJE PLANIRANIH INTERKONEKTIVNIH VODOVI U REGIJI • Rezultati: • nijedan od kandidata ne doprinosi značajnije povećanju razmjena • električne energije u regiji. • Ipak, kada bi se rangirali navedeni kandidati, onda bi po utjecaju • na regionalne prilike mogli definirati slijedeću listu prioriteta: • DV 2x400 kV Ernestinovo (HR) – Pecs (HU) (u izgradnji) • DV 400 kV Ernestinovo (HR) – Sombor (RS) – Pecs (HU) (trokut) • DV 400 kV Kashar (AL) – Kosovo B (KS) • DV 400 kV Zerjavinec (HR) – Cirkovce (SI) – Heviz (HU) (trokut) • DV 400 kV Marica Istok I (BG) – Nea Santa (GR) • DV 400 kV Novi Sad (RS) – Timisoara (RO) • HVDC 400 kV Konjsko (HR) – Candia (IT) • HVDC 400 kV Durres (AL) – Foggia (IT) + OHL 400 kV Bitola (MK) – Elbasan (AL)

  12. OČEKIVANA ZAGUŠENJA U REGIONALNOJ PRIJENOSNOJ MREŽI Nakon više od 100 scenarija razvoja i razmjena: Interkonekcije nisu problem Zagušenja prijenosne mreže regije u tržišnim okolnostima mogu se očekivati u internim mrežama Albanije, Srbije i Rumunjske. Radi se o internim DV 400 kV i 220 kV te TR 400/220 kV i 220/110 kV. Neki od uočenih uskih grla u prijenosnoj mreži mogli bi se otkloniti pogonskim i dispečerskim zahvatima. Poseban problem u regiji predstavlja način određivanja i dodjele NTC vrijednosti na prekograničnim vodovima, što je zasebna tema i ovdje se neće šire elaborirati.

  13. ZAKLJUČCI • EES u regiji najusitnjeniji u Europi • EES u regiji međusobno najbolje povezani u Europi • EES cijele regije manji od EES Turske ili Italije – povezivanje ima značajan utjecaj na pogon EES JIE • izgradnja jednog većeg objekta ima značajan utjecaj na pogon EES u cijeloj regiji • različita razina naslijeđa u smislu organizacije, starosti (obnove), deregulacije, općenito stanja gospodarstva, a iste obaveze iz Ugovora o Energetskoj zajednici o uspostavi zajedničkog tržišta • Na temelju svega navedenog u narednom razdoblju može se očekivati daljnje intenziviranje regionalnih integracijskih aktivnosti u EES. • Savjetovanje crnogorskog ogranka CIGRE • Pržno, 12.-16.10.2009.

  14. HVALA NA PAŽNJI www.eihp.hr goran.majstrovic@eihp.hr