1 / 12

IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING

IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING. URS Corporation January 22, 2003. Engineering Investigations  Embankment Heights and Design. Two Embankment Concepts Were Evaluated Rock toe berm on slough side Bench on slough side (variable width). Rock Toe Berm Option.

stuart
Télécharger la présentation

IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IN-DELTA STORAGE PROGRAMSTAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003

  2. Engineering Investigations Embankment Heights and Design Two Embankment Concepts Were Evaluated • Rock toe berm on slough side • Bench on slough side (variable width)

  3. Rock Toe Berm Option

  4. Bench Option

  5. Freeboard Studies • Freeboard Criterion Greater of: • 3’ + 100-yr. flood stage, or • Wind wave runup + setup + 100-yr. flood stage • Embankment Crest: • Webb Tract: Crest El. 10.0 to El 10.1 • Bacon Island: Crest El. 10.1 to El. 10.3 • Crest elevation lower than for 2001 study

  6. Stability Analysis • Stability analyses performed for various conditions • Rock toe berm and bench options • Various water levels in slough and reservoir • Min/max elevations of base of peat layer • Load conditions • Foundation conditions for analysis from reports • Department of Water Resources • Bureau of Reclamation • Army Corps of Engineers • Consultants

  7. LOAD CONDITION W.S. SLOUGH/RES. EMBANKMENT SIDE ROCK TOE BERM BENCH LONG-TERM -1.0 / 4.0 SLOUGH 1.6 - 1.8 1.5 - 1.6 LONG-TERM 7.0 / empty RESERVOIR 1.7 - 1.9 1.5 - 1.6 SUDDEN DRAWDOWN 6.0 / 4.0 to empty RESERVOIR 1.5 - 1.6 1.3 - 1.4 POST-SEISMIC -1.0 / 4.0 SLOUGH 1.4 - 1.6 1.1 - 1.2 POST-SEISMIC 3.5 / empty RESERVOIR 1.3 - 1.4 1.1 - 1.2 Summary of Calculated Factors of Safety* • * Lowest F.S. shown for peat at El. –40 and –20, for rock toe berm and bench. • Factors of safety for rock toe berm are greater, and seismic deformations lower, than for bench option. • Risk and cost to be considered to recommend rock toe berm or bench option

  8. Borrow Area Investigations • Field investigation conducted in December 2002 • 10 borings drilled (15’-19’ deep) totaling 165 ft on each island • Laboratory tests performed to characterize materials • Borrow areas delineated •  Sandy soils within 15 feet of ground surface •  Volumes being estimated • Results to be used for construction cost estimation

  9. Seepage Studies • Seepage control alternatives considered (mostly on Webb Tract & Bacon Island) • Interceptor wells • Slurry walls • Reservoir floor clay blankets • Collector trenches • Capital cost, constructibility, and operation & maintenance considerations

  10. Seepage Studies (cont’d) • Estimated pumping rates to control seepage & exit gradients •  Reservoir water surface @ el. +4.0 •  Well spacing @ 160 feet •  6 gpm to 8 gpm per well •  Exit gradients less than 0.3 (criterion) • Seepage control can be on Webb Tract and Bacon Island • Seepage quantities are less than for 2001 study

More Related