1 / 13

PH-DT Technical Meeting

PH-DT Technical Meeting. https :// indico.cern.ch/conferenceDisplay.py?confId=241961 A.Catinaccio , M.Capeans . 21/03/2013. Outline. News from last DTCM meeting (Andrea) Update on Activity planning EO, EM1, EM2 (Christophe, Hans & P- Ange , Antti & Raphael)

suchi
Télécharger la présentation

PH-DT Technical Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PH-DT Technical Meeting https://indico.cern.ch/conferenceDisplay.py?confId=241961 A.Catinaccio, M.Capeans. 21/03/2013

  2. Outline • News from last DTCM meeting (Andrea) • Update on Activity planning EO, EM1, EM2 (Christophe, Hans & P-Ange, Antti & Raphael) • Status conformity WS’s: 20,155,21,3,25 (Nicolas) • What has been done so far and what will be done next. Status agreement with Alice for 162. Procedure for electrical inspections. (Mark) • Tour de table • Visit to WS 166 (with Jerome) • AOB

  3. News MARS Recruitment • Board for an engineer in micro-fabrication processes (CP E) under preparation (short list done) • Just published: Expert Engineer in Mechanical Design and Simulation (CP E)for EO section • VN: https://ert.cern.ch/browse_www/wd_portal.show_job?p_web_site_id=1&p_web_page_id=10751 • Closing date: 16/4 • Under preparation: electro-mechanical tech (CP C), focus on irradiation facilities

  4. Students Summer students (deadline expired) • Projects submitted: • 2x Gas Project (R.Guida, B.Mandelli) • 3x Silicon detectors R&D SDD lab (M.Moll, D.Muenstermann, M.Fernandez) • 1x LHCb RICH upgrade (T.Gys) • 2x Cooling (P.Petagna) • 2x MPGD (L.Ropelewski) Temporary work children of CERN personnel (DT internal deadline for proposals: 25/3) • Office work, light or  heavy manual work, electronics, electrical, mechanical, technical drawing, computing, office computing work • 4 weeks in the 17 June to 13 September • Candidates: 18 – 24 y old • Allowance will be CHF 1500.- • Current Proposals: • 2x Gas Project: work in the electrical and mechanical workshops (P.Carrie)

  5. Arrivals in DT + 3 Stagers (2 cooling, 1 Controls) • DT Students quota: • 35PM in 2012 • 42PM in 2013 Next Technical Student Committee: 23/4

  6. PH-DT Investments Proposals 21.1.13: Sent a memo to PH requesting the replacement of the WireBondingMachines in the Bonding facility ~ 150 kCHf in 2013

  7. Others • A.Onnela has agreed to chair a working group to evaluate the use of DT cars (fleet, rules of use…) • M. Hatch is collecting contributions for the PH-DT Annual Report, deadline March 8th • Next PH-DT Group Seasonal meeting & coffee will take place on April 24th pm

  8. Activity Requests • New: Serto available to develop fast robotic fittings for upgrade (EO design) • New: Charles-Henri for PH-EDU requests some integration studies to EO (CB to follow up) • New: ATLAS request for a machining tech: non continuous job, very short notice jobs, approx. for 2 m • New: MICE B-measurements 5 weeks of work in England by PA.(they are ready) • New : Totem upgrade: in discussion DT involvement • Others ? • Started: IDEP opening / closing: involvement EM2 (FP, JB, ND, HD, AC) • Started: TRT leaks repair: involvement EM2 (FP, JB, ND, HD) • Started: New thermal mockup for IBL services: (FX, CB and technician TBD) • Started: Clic Pixel : JD x design, DP x composites, BB and PC needed for tools and parts / assembly of thermal mockup • Started: CMS tracker upgrade: JD gradually involved

  9. Already Know Requests Reminder (other tasks from list of last meeting) • B-field measurement activities and magnet repair for LHCb (OJ, PA and Francois): (delayed to September) • MICE experiment: 5 weeks of work in England by PA. (was delayed) • Pierre Ange reported the progress dismantling the magnets in the PS area: MP22 dismounted and being stored 185, HARP magnet now being dismounted and controlled by RP on march 6, then stored in B185; for the DIRAC magnet, the infrastructure is being dismounted. The interim should be prolonged till April (Mar to check with PB) (on- going) • Atlas Micromegas, work continues in EO / EM2 (maintain present engagement) (on- going) • Cooling design support request by Paola: (on- going) • Requests To Be Confirmed: • New request: André Rubbia requesting support for construction of a big magnet (coils) for the Neutrinos with Finlande (LBINO). AR should contact EO for studies early 2013. (NO News) • Projet LAGUNA : Nicolas mentionne qu'il sera impliqué dans ce projet suite à la demande de André RUBBIA -> plus d'informations à venir (TBC)

  10. For discussion Invitation to DTTM to other WS supervisors ? Proposals for other people attending ? Next meeting scheduled for the 25th of April

  11. Material

  12. Towards conformity of the machines - Summary table with the budget cost estimates Summary of the accumulated budget to solve non conformity for machines in DT and DT/Atlas – DT/Alice common workshops: in order of suggested priority

  13. DT WS’s and conformity • WS 162We estimated before 46000: new official quote 28 K by scraping some old machines. Agreement needed urgently with Alice on sharing (in order to get sufficient priority for the work to be done by MME along this year). • WS20, 21, 3 and 155: Nicolas is proceeding (material ordered) with conformity Some machines scrapped In the order of 6K About 20 K to be shared at 50%

More Related