An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCP 14 Request for Final Payment

  2. Front Page

  3. Bottom of Sheet • Do not submit an incomplete packet • Ledger questions to John Fox (651-366-4854) • DCP 14 questions to Mark Channer (651-366-3828)

  4. Certified to Date

  5. Total Due • Total Due + BR Bond/Misc Approp = Certified to Date • Total Due under the Certified to Date Must Equal Reimbursement Request • No hand-written edits

  6. Retainage • Retainage MUST be set to ZERO

  7. Required Checklist • Required if applicable • Mark ALL lines. • Indicate those that do not apply.

  8. Page 2 – Sample Final Contract Voucher

  9. Page 3 – Sample SA Payment Request • Must be “Final” • Include all accompanying documents

  10. Page 4 – DCP 12 • Submit to DSAE for Approval

  11. DCP 12 – Top of Sheet

  12. DCP 12 – Middle of Sheet

  13. DCP 12 – Bottom of Sheet • Total Increased costs cannot exceed actual cost increase • Participation % • Additional Federal Increased Costs. • Do not submit if incomplete.

  14. Pages 5 & 6 – Sample SA

  15. Page 7 – Sample CO

  16. Page 8 – Sample Work Order • Work Orders are not mandatory, but should be included if they support the SA’s or CO’s.

  17. Page 9 – Sample Overrun Justification • Any time there are overruns, an Overrun Justification should be sent. • The Feds what to see why there were overruns, whether you ask for additional funds or not.

  18. Page 10 – Sample Material Certification Exception Summary • Must be included even if there are no exceptions.

  19. Page 11 – Certificate of Performance • If the Final estimate voucher contains a similar statement by the engineer in charge of the work, the Certificate of Performance will not be required. • State Statutes require that this Certificate is to be signed by the Engineer in Charge.

  20. Pages 12 & 13 – Final Inspection Report

  21. Pages 14 and 15 – Sample Certificate of Final Acceptance MUST BE NOTARIZED!

  22. Page 16 - Sample of the Certificate of Final Acceptance

  23. Copies Available • An electronic (PDF) copy of the Request for Final Payment sample packet is available on the DCP Checklist page. • http://www.dot.state.mn.us/stateaid/dcp/dcpchecklist.htm

  24. Questions?

  25. THANK YOU!