TASA Transportation Alternatives Set-Aside October 30, 2019
Table of contents 1 Story Time 3-6 2 Tables 7-10 3 Box Layouts 11-15 4 Charts 16-31 5 Diagrams 32-44 6 Maps 45-41 7 Color Scheme and Useful Objects 52-55
FM 270 Bikeway - Example • Memorial Dr to Terry Hershey Trail • Terry Hershey Trail to Briar Hill • Scope of Work • Construct concrete 10-foot wide shared use path • Length • 0.632 mile • TE 2014 project • $1,086,027 • Funds Cat. 3 • Federal $868,822 • State $ 32,404 • Local $184,801 • Time line • TE 2012 • TIP amendment 8/12/2013 • AFA 7/18/14 • LET • Construction: Spring ’18?
FM 518 Bypass Hike and Bike Trail – 2012 TE • Scope of Work • Construct concrete 10-foot wide shared use path • Length • 1.8 miles • TE 2012 project • $3.6 M • Funds Cat. 3 • Federal $2.2 M • Project Scope Problems • Bridge
FM 518 Bypass Hike and Bike Trail – 2015 MPO TAP • re-submitted for MPO TAP - 2015
Ped/Bike Funding • Funds • Transportation Alternative Set Aside (TASA) • (~2%) of Surface Transportation Block Grant funds (STBG formerly STP-MM). • Cat. 9 • Previously TE, TAP • 2 Call for Projects • Competitive Process • MPO • Included Transit - 2015 • State • nonurban communities >5,000 • Small urban • Ped/Bike
Eligibility – Ped/Bike Projects • State • Construction only • Small % for other • MPO • % for amenities • Benches, landscaping, etc. • Connectivity and Access • First and last mile • Transit Center • Park and Ride • Park and Pool • Bus Stop • Pedestrian/Bicycle Network • Logical termini
Ped/Bike Funding • Restrictive funds (eligibility) • Funds are available for obligation (not expenditure!) – 3 yrs after that last day of the fiscal year when the funds were authorized. • Difficult to back fill a gap • Project that falls behind – Delays? • Cat. 5 CMAQ • Risk lapsing funds as a state • Between now and then: • Change of scope • Outreach • Delays • ROW / easement • Utility coordination