Energy Development Plan for Bijeljina & Bogati ć

This project is co-funded by EU. Energy Development Plan for Bijeljina & Bogati ć. European Centre for Renewable Energy Güssing Ltd. 7540 Güssing ,Europastraße 1 Internet: www.eee-info.net / Mail: office @eee-info.net. Contents of presentation and discussion.

sven
Télécharger la présentation

Energy Development Plan for Bijeljina & Bogati ć

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. This project is co-funded by EU Energy Development Plan forBijeljina & Bogatić European CentreforRenewableEnergyGüssing Ltd. 7540 Güssing,Europastraße 1 Internet: www.eee-info.net / Mail: office@eee-info.net

  2. Contents of presentationanddiscussion • Overview on fulfilledactivitieswithinthe project • Overview of thecontentsof theEnergy Development Plan • First results of the evaluation of data in Bogatić • First results of the evaluation of data in Bijeljina • Summary / Comaprison of the actual status • Discussion of measures for the Development Plan and Feasibility Study • Overview on necessary information / Further steps in the project Visit of Bijeljinaand Bogatić 10th – 11th December 2013

  3. Activities in the project 2013 Visit of Bijeljina andBogatić 10th – 11th December 2013

  4. Contents of theEnergy Development Plan • Main dataof the project area (Bijeljina and Bogatić) • geographical situation / climate, • Demographi c/economic development and structure • Energy supply in the region • Energy demand and used energy sources in Bijeljina and Bogatić • Resources within the municipalities • Forestry & agricultural sector, solar energy, residues, others (geothermal, hydro, wind, etc.) • Ratio between available resources & current energy demand • Evaluation of measures • Energy saving and energy efficiency measures • RES implementation measures • Defined measures are basis for deeper investigations of Feasibility Study Visit of Bijeljinaand Bogatić 10th – 11th December 2013

  5. RESULTS - Energy Development Plan forBogatić

  6. Output / Results–Bogatić Structureofaverageannualenergydemand in Bogatic Visit of Bijeljina and Bogatić 10th – 11th December 2013

  7. Output / Results–Bogatić Structureofaverageannualenergydemandandcosts – householdsandmunicipality Main supplyisbyelectricityandbiomass Veryhighshareofelectricity in Bogaticbecauseofelectricheatings! 70% ofelectricityisforheating! Visit of Bijeljina and Bogatić 10th – 11th December 2013

  8. Output / Results–Bogatić Renewableenergypotentialsreadytouse Biogas: Potential is 12 MWelfrommaizestrawandanimalmanure Possibility: Constructionof a biogas-gridwithdecentral CHP- units Only a shareof 20% ofmaizestrawcanbefedinto a biogasfermenter. Geothermy: temperaturelevelforelectricityproductiontoolow Possibility: Couplingwith Biogas plant (heat) toheightentemperature andtoenableelectricitygenerationwith ORC - process Straw: thereisenoughstrawtoreplacelignite (pellets, briquets) Energycontentof a 1kg strawbriquetis ~ 1,2fold theenergycontentof 1kg oflignite Visit of Bijeljina and Bogatić 10th – 11th December 2013

  9. Output / Results–Bogatić Cofermentationofanimalmanureandmaizestraw:

  10. Output / Results–Bogatić Renewableenergypotentialstobedeveloped Biogas potential ofthe 20% non-food-area: 3,7 MWel Visit of Bijeljina and Bogatić 10th – 11th December 2013

  11. Output / Results–Bogatić Summary Theoretically, thebiomassressourcescan cover: ~ 40% oftheelectricitydemand ~ 250% oftheheatdemand ofhouseholdsandmunicipality. (The real covering rate isdepending on thechosenstrategyandtechnology) Regardingthe European Strategy 2020: A minimumshareof 20% ofrenewablesisfeasible Possiblesolutions: Geothermy (coupledwithbiogas) anddistrictheatingsystems (thisisstronglyconnectedtosettlementdevelopmentandspatialplanning) Replacementoflignitebyagriculturalbiomasslikeenergywood and (preferablymaize-) strawbriquets. Reductionof CO2 emissions: 18 000 t/a (Energycostscanbekeptequaltoorlessthanlignite, briquetproductioncoulduseheatofbiogas plant) Visit of Bijeljina and Bogatić 10th – 11th December 2013

  12. RESULTS - Energy Development Plan forBijeljina

  13. Output / Results–Bijeljina Structureofaverageannualenergydemand in Bijeljina Visit of Bijeljina and Bogatić 10th – 11th December 2013

  14. Output / Results–Bijeljina Structureofaverageannualenergydemandandcosts – householdsandmunicipality Main supplyisbyelectricityandbiomass Veryhighshareofbiomass in Bijeljinaforheatings, goodquoteregardingrenewables 20% ofbiomassisfromlocalproduction, 80% is „imported“! Visit of Bijeljina and Bogatić 10th – 11th December 2013

  15. Output / Results–Bijeljina Renewableenergypotentialsreadytouse Biogas: Potential is ~15 MWelfrommaizestrawandanimalmanure Possibility: Constructionof a biogas-gridwithdecentral CHP- units Only a shareof 20% ofmaizestrawcanbefedinto a biogasfermenter. Straw: thereisenoughstrawtoreplacelignite (pellets, briquets). Usingmaizestraw, about 500.000 MWhofheatcanbeprovided. Energycontentof a 1kg strawbriquetis ~ 1,2fold theenergycontentof 1kg oflignite Visit of Bijeljina and Bogatić 10th – 11th December 2013

  16. Output / Results–Bijeljina Cofermentationofanimalmanureandmaizestraw:

  17. Output / Results–Bijeljina Renewableenergypotentialstobedeveloped Biogas potential ofthe 20% non-food-area: 3,7 MWel Visit of Bijeljina and Bogatić 10th – 11th December 2013

  18. Output / Results–Bijeljina Summary Theoretically, thebiomassressourcescan cover: ~ 66% oftheelectricitydemand ~ 38% oftheheatdemand ofhouseholdsandmunicipality. (The real covering rate isdepending on thechosenstrategyandtechnology) Regardingthe European Strategy 2020: A minimumshareof 20% ofrenewablesisalreadyreached Possiblefurthersolutions: Biogas CHP anddistrictheatingsystemsorbiogasgridwithdecentral CHP units (thisisstronglyconnectedtosettlementdevelopmentandspatialplanning) Replacementoflignitebyagriculturalbiomasslikeenergywood and (preferablymaize-) strawbriquets. Reductionof CO2 emissions: 120 000 t/a (Energycostscanbekeptequaltoorlessthanlignite, briquetproductioncoulduseheatofbiogas plant) Visit of Bijeljina and Bogatić 10th – 11th December 2013

  19. Discussion of measuresforEnergy Development Plan & Feasibility Study 1) Evaluation of measureswithintheEnergy Development Plan (Bijeljina and Bogatić) • Energy efficiency and saving measures (thermal insulation, exchange of windows, replacement of old inefficient appliances, …) • Raising efficiency of public buildings • Municipal buildings in Bijeljina have an average key figure of 220 kWh/m² • Municipal buildings in Bogatic have an average key figure of 298 kWh/m² • Energy production measures • Forestal biomass potentials - forestry resources are existing - amounts are already used • Agricultural biomass potentials – theoretically sufficient to replace lignite (problem is heat supply infrastructure) • Geothermy – potential is high but depending on development costs to arrive at reasonable temperature levels for electricity production 2) Feasibility study Visit of Bijeljinaand Bogatić 10th – 11th December 2013

  20. Evaluation of measuresfor • establishment of an energy & climate model region - • foundation of an association & a common central • coordination point • head of the central coordination point should be a Model-Region-Manager • MRM gets supported by the association (municipalities) • MRM keeps the municipalities updated on subsidies in all energy related sectors (thermal insulation, pv, etc.) • MRM creates news (website, Infoflyer) for the • inhabitants to raise awareness establishment of: central coordination point central contact person • MRM contributes to awareness rising on energy efficiency measures in public buildings • MRM supports and coordinates the upgrading of • public street lighting • Awareness rising in the private sector by establishing • an info-flyer by the MRM that gets regularly sent out • MRM represents a contact point to advise citizens • MRM coordinates the experts working on the establishment of energy producing plants • MRM informs the citizens on realized projects • MRM raises awareness on the possibility of household to connect to a district heating grid Visit of Bijeljina and Bogatić 10th – 11th December 2013

  21. Necessaryinformation – dataforfinalizingstudies • Maps on the location of: - municipal buildings - large companies - geothermal source (if existing) - energy producing plants (if existing) • Data on: - regulatory framework for future subsidies of energy producing plants (biogas-, geothermal plants, thermal grids, connection fees - number / share of buildings with central heating system Visit of Bijeljina and Bogatić 10th – 11th December 2013

  22. Timeframes–furthersteps in theproject Visit of Bijeljina and Bogatić 10th – 11th December 2013

  23. Thankyouforyourattention European Center forRenewable Energy Güssing Ltd. Europastraße 1 A-7540 Güssing Web: www.eee-info.net Mail: office@eee-info.net Phone.: 03322 / 9010 850- 0 Fax: 03322 / 9010 85012 Visit of Bijeljina and Bogatić 10th – 11th December 2013