1 / 30

Fracturas en pozos no convencionales

Fracturas en pozos no convencionales. Presenter’s Name. Date. Experiencias en fracturas no convencionales. 1,200,000 HHP 2011: aprox.10,000 fracturas. Pozo Tipo - EEUU. Plug & Perf. Etapas Fractura: 16 Distancia e/tapones (mts): 111

taariq
Télécharger la présentation

Fracturas en pozos no convencionales

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fracturas en pozos no convencionales Presenter’s Name Date

  2. Experiencias en fracturas no convencionales • 1,200,000 HHP • 2011: aprox.10,000 fracturas

  3. Pozo Tipo - EEUU

  4. Plug & Perf Etapas Fractura: 16 Distancia e/tapones (mts): 111 Clusters por etapa: 8 Distancia e/clusters (mts): 12 Total de Fracturas: 128

  5. Plug & perf- Esquema de disparos

  6. Plug & Perf – Secuencia de operaciones • Calibrar y punzar 1era etapa con CT • Desmontar CT, montar set de fracturas y WL • Fracturar 1era Etapa • Pump Down WL con Frac plug y cañones • Sacar WL, cerrar válvula superior • Bombear top ball y fracturar 2da etapa • Plug & Perf etapas subsiguientes • Desmantelar set de fracturas, instalar CT • Moler tapones y producir pozo • Promedio: 4 etapas por día

  7. Multizone Stimulation Technologies - JITP

  8. Multizone Stimulation Technologies – ACT Frac

  9. Sistemas de multi-fracturas Open Hole Zone Select

  10. ZoneSelectTM– Multi-zone completion system

  11. Tapones de material compuesto

  12. Composite Plugs Composite Pump Down Plugs 13

  13. Diseño Fractura – Slickwater

  14. Gráfica Fractura – Slickwater

  15. Diseño Fractura – Hibrida X-linked EagleFord

  16. Gráfica Fractura – hibrida X-linked EagleFord

  17. Tendencias • Laterales mas largos • Equipamiento (presiones, HHP, CT, wireline, tapones, etc…) • Mayor cantidad de fracturas • Espaciamiento de clusters según perfiles (sweet spots) • Mejor divergencia (menos clusters y mas etapas de fractura) • Mayor conductividad, geles croslinkeados

  18. Lay out Plug & perf – I (40.000 HHP)

  19. Lay Out Plug & perf – II (56,000 HHP)

  20. Lay Out Plug & perf – III (2 x 16,000 HHP)

  21. Lay out Plug & perf – IV (Locación seca)

  22. Fracturas en Argentina • Lajas, Molles • Fernandez Oro / Centenario • Caudales de 40 a 50 bpm • Bajas cargas poliméricas (hasta 18 lbs/1000 gal) • Promedio 1500 sks • Fracturas híbridas con gel lineal – gel activado • Pozos verticales, tapones composite • Una etapa cada 14 horas

  23. Tratamiento de fractura Lajas

  24. Carta bombeo fractura Lajas

  25. Fracturas en Vaca Muerta • Plaza Huincul, pozos someros • Fracturas híbridas con slick water – gel activado • Hasta 60 BPM • Pozos verticales

  26. Diseño de fractura Vaca Muerta

  27. Carta de bombeo Vaca Muerta

  28. Equipos de fracturas en Argentina • Equipos en Argentina • seis bombas (12,000 hhp) • dos blenders (100 y 40 bpm), dos unidades de hidratación, dos sand feeders, tres sand dumpers, dos data vans, dos manifolds, doce piletas, otros..

  29. Equipos de fracturas en Argentina • Equipamiento en frontera • siete bombas (14,000 hhp), un blender (100 bpm), una data van, un sand feeder • un set de CT incluyendo bomba y nitrógeno

  30. Equipos de fracturas en Argentina • Equipamiento en construcción • 10,000 hhp, un manifold, una unidad de hidratación, una unidad dosificadora químicos C10 • segundo set de CT

More Related