Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014

Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014. Site Location. Located 1.3 miles south of downtown Collinsville 60 acres Bounded by: Garnett/RR to east Strip mine pit to south Acreage to west Faith Assembly Church to north. Site History.

talib
Télécharger la présentation

Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tulsa Fuel & Manufacturing Superfund SiteRemedial DesignandCleanup PlansSeptember 2014

  2. Site Location • Located 1.3 miles south of downtown Collinsville • 60 acres • Bounded by: • Garnett/RR to east • Strip mine pit to south • Acreage to west • Faith Assembly Church to north

  3. Site History • Active from 1914 – 1925 • Zinc Smelter and Lead Roaster • Foundations and building footings remain • Private Residence 1935 - 2002

  4. Impacted Areas • Green-Areas that do not require cleanup • Pink-Areas that require cleanup to prevent unacceptable exposure through soil, sediment, and surface water

  5. Site Cleanup Goals • Site remediation goals are protective of human health and the environment • Impacts above the remediation goals will be addressed along with visual waste

  6. Record of Decision • Issued November 2008 • The remedy is the consolidation and capping of soil, sediment, and waste

  7. Proposed ROD Amendment • Groundwater impacts • No groundwater impacts • Eliminate state requirement or five foot separation • Treatability Study • Indicated treatment not feasible • Future Community Participation • Public comment period on proposed plan • Public notice and open house

  8. Remedial Design

  9. Remedial DesignStormwater Management

  10. Remedial Action

  11. Proposed RA Schedule • Upon receipt of funding • Procurement of Contractor – 60 days • Pre-Construction Tasks – 45 days • Mobilization – 6 months • Site Restoration – 4 months • Operational and Functional – 1 year • Contract Closeout – 30 days

  12. RA Activities • Site Mobilization • Clear and Grub • Soil and Sediment Erosion Control • Decontamination Area • Dewatering the Ponds • Waste, Soil, and Sediment Consolidation • Confirmation Sampling • Remove Existing Wells/Install O&M Wells • Site Grading and Seeding • Demobilization

  13. Protective Elements • Transportation Plan • Air Monitoring • Site Management Plan • Stormwater Management

  14. Operation and Maintenance

  15. RA Completion

  16. Community Participation • Site documents can be found at: • Collinsville Public Library • Oklahoma Department of Environmental Quality • Central Records • http://www.deq.state.ok.us/lpdnew/SF/TulsaFuels.htm • United States Environmental Protection Agency

  17. Questions or Comments?