Inter Agency Technical Interchange Meeting (IATIM)

Inter Agency Technical Interchange Meeting (IATIM). December 7, 2010 Anaheim, California. Discussions. Defining comprehensive Operation and Support DPHM requirements Specifying and flowing down comprehensive DPHM requirements in contracts

Télécharger la présentation

Inter Agency Technical Interchange Meeting (IATIM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inter Agency Technical Interchange Meeting(IATIM) • December 7, 2010 • Anaheim, California

  2. Discussions • Defining comprehensive Operation and Support DPHM requirements • Specifying and flowing down comprehensive DPHM requirements in contracts •  Balancing proposal evaluation and award based on design for: • Mission Success • Sustainment • Availability • Safety • Total Ownership • Equal weighting of Acquisition Cost, Production, Performance and Sustainment • Overview of technologies available today and intra-agency research to support the design of effective DPHM solutions • Thoughts on DPHM requirements

  3. Core Issue Acquisition Reform: A Mandate for Change Defense Procurement and Acquisition Policy MissionEnable the Service Components and Other Defense Agencies to effectively deliver equipment and services that meet the needs of the warfighter through innovative policy, guidance, and oversight while being good stewards of the taxpayers' money.

  4. Standard Response to Diagnostics Design Plans This is extra effort This is not required

  5. The Standard Response Violates Design Balance and Adds cost and Risk to the Project • Diagnostics Design • Embedded Diagnostics • Corrective Maintenance • Prognostics • Planned Maintenance • Logistics Support Design • Operation Reliability • Mission / Operation Success • Safety • Cost • Availability Integrated Systems Diagnostics Design Balance for Systems Health Management and Maintenance

  6. Typical Proposal or Marketing Message Where and How does this Begin? Where is the Authority to Make this happen? Where is the Accountability?

  7. Solution Develop a Plan and Work the Plan First Things First Define Requirements That Meet Project Life Cycle Needs

  8. Understand Real Needs • Develop Plan • Develop Design • Validate Design • Field Effective System Project New Design Partial Design / Legacy Customer & Contractor Working Together Define Requirements Define Requirements Design Update / Assessment Diagnostics Plan New Design Diagnostic Plan • Diagnostics Engineering • Reliability • Test Engineering • Prognostics • Logistics • Maintainability Task Assignments • Dependant Users • Embedded Diagnostics • Prognostics • Safety • Logistics • Publications (IETM) • Mission Control System Level Validation Gather Data Integrate System Level Model Assess / Develop SubSystem Models & Trade Studies for Design Influence Internal Validation Lower Level Model / Design Change Required

  9. Integrated Systems Diagnostics Design Yields Compliant Diagnostics & Prognostics Health Management (DPHM) eXpress Diagnostic Engineering FMECA+ Prognostics CBM Diagnostics CM DPHM Scheduled Maint.RCM Reliability Engineering Maintenance Engineering