1 / 12

Model Magnet R&D (WBS 2.2) LARP Collaboration Meeting October 5-6, 2005 Gian Luca Sabbi

BNL - FNAL - LBNL - SLAC. Model Magnet R&D (WBS 2.2) LARP Collaboration Meeting October 5-6, 2005 Gian Luca Sabbi. LARP Magnet Program Goals. FY09 Milestone: Demonstrate viability of Nb 3 Sn technology for “Quad-first” option.

tausiq
Télécharger la présentation

Model Magnet R&D (WBS 2.2) LARP Collaboration Meeting October 5-6, 2005 Gian Luca Sabbi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BNL - FNAL - LBNL - SLAC Model Magnet R&D (WBS 2.2) LARP Collaboration Meeting October 5-6, 2005 Gian Luca Sabbi

  2. LARP Magnet Program Goals FY09 Milestone: Demonstrate viability of Nb3Sn technology for “Quad-first” option 1. Capability to deliver predictable, reproducible performance: TQ (Technology Quads, 2005-07) D = 90 mm, L = 1 m, Gnom > 200 T/m 2. Capability to scale-up the magnet length: LQ (Long Quadrupoles, 2008-09) D = 90 mm, L = 4 m, Gnom > 200 T/m 3. Capability to reach high gradient (pole tip field) in large aperture: HQ (High Gradient Quads, 2008-09) D = 90 mm, L = 1 m, Gnom > 250 T/m • Fabrication of the first two TQ quads (TQS01 and TQC01) has started • TQS01 test in February/March 2006; TQC01 test in April/May 2006

  3. Technology Quads (TQ) • Objective: contribute to developing the technology base for LQ & HQ: • evaluate conductor and cable performance: stability, stress limits • develop and select coil fabrication procedures • select the mechanical design concept and support structure • demonstrate predictable and reproducible performance • Implementation: two series, same coil design, different structures: • TQSmodels: shell-based structure • TQC models: collar-based structure • Magnet parameters: • 1 m length, 90 mm aperture, 11-13 T coil peak field • Nominal gradient 200 T/m; maximum gradient 215-265 T/m

  4. TQS01: Shell-based Structure • Concept: • Aluminum shell over yoke and pads • Assembly based on bladders and keys • Advantages: • Can deliver very high pre-stress • Large pre-stress increase at cool-down • Easy assembly/disassembly/reassembly • R&D issues: • Coil alignment, field quality • Long vs. segmented shells TQS01 task leader: S. Caspi - Test planned for February/March 2006

  5. TQC01: Collar-based Structure • Concept: • Support by thick SS collars • Assembly w/external press • Advantages: • Proven coil positioning • Proven length scale-up • R&D issues: • Deliver required pre-stress • Pre-stress overshoot • Flexibility for R&D TQC01 task leader: R. Bossert - Test planned for April/May 2006

  6. TQ Coil Winding Status • 6 unit lengths of practice cable and 10 UL of cable fabricated at LBNL • 8 insulated UL available for production coils, 2 additional UL to follow • 4 practice coils wound and cured at FNAL • Various improvement were included based on practice winding/curing • 2 production coils for TQS01 were fabricated at FNAL

  7. TQ Coil Reaction and Impregnation • The first set of practice coils were reacted and impregnated at FNAL • Good results on the first set of impregnated coils • The second pair of practice coils is being reacted at LBNL • Strand & cable samples are being reacted with the practice coils • Reaction of first pair of production coils starts in 3 weeks

  8. TQ mechanical models • Mechanical models using dummy coils: • TQS01 (2004) TQC01 (underway) • Mechanical models using the practice coils will be performed in the next 3 months in preparation for magnet assembly

  9. TQ Schedule (Rev. 10/5/2005) Q3-05 Q4 2005 Q1 2006 Q2 2006 Q3 2006

  10. TQ Program following TQS01-TQC01 • 1. Additional tests using the same coil design • TQS02: reconfigure/optimize based on TQS01 results • Increase preload?(e.g. 4.2 K to 1.9 K) Modify structure? (as for HD1) • Replace quadrant with spare?(if localized quenches observed) • TQC02: new coils (w/RRP conductor) in collar-based structure • Feedback from TQC01 can be incorporated at assembly • Coils might be redirected to TQS depending on test results • TQE01: coil-structure exchange • Disassemble TQC01 coil and test in TQS01 structure • Some technical issues to be addressed; decision after TQS01/TQC01 tests • 2. Coil iteration and fabrication of TQS03 & TQC03 coils

  11. TQ plan after S01-C01 (Rev. 10/5/05)

  12. Main focus for FY06-Q1 & Q2 Start in FY06, complete in FY07 Model Magnet Tasks & Budget Summary