Current Status

Current Status. ● Stable system ♦ Intensively used (~1000 emergency dumps since Nov.09) ♦ Get confidence thanks to Operational tests (see next slide) ♦ No false dump. ♦ High availability, except for: ■ VME-bus controller board failures ( same problem with BI crates)

taya
Télécharger la présentation

Current Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Status ● Stable system ♦ Intensively used (~1000 emergency dumps since Nov.09) ♦ Get confidence thanks to Operational tests (see next slide) ♦ No false dump ♦ High availability, except for: ■ VME-bus controller board failures (same problem with BI crates) BE/CO is aware of this issue.A solution/cure is expected… ■ few failures with redundant PSU installed in CIBU Thanks to redundancy, never lead to a beam operation disruption. ■ 3 failures with redundant PSU of the VME crate Always a primary side fault,togetherwith a permanent short => open the circuit breaker. Unfortunately, only one UPS “reglette” is installed in each BIC’s racks; in other words: our redundancy is useless! No immediate solution. Waiting for feedback from BE/CO & Elcotron…

  2. Radiation issues? ● Controllers are installed in: CCR, SR3, SR7, UA (23,27,43,47,63,67,83,87), UJ33, TZ76, US15, USC55 and UJ56 ♦ UJ56 case: a move to USC55 is already scheduled (shutdown 2012?) (re-commissioning has to performed) ♦ Other cases: still waiting for R2E inputs (a move to the surface is technically possible; simply a question of cost..) ● CIBUs are always installed in the User Systems’ racks. The most critical cases are UJ14, UJ16, RRs,… ♦ If User System equipment is moved, CIBU will be obviously moved. ♦ Irradiation tests performed: the CIBU is most likely less sensitive than the host Equipment. ♦ Thanks to redundancy, SEU will not compromise safety but obviously could provoke a beam dump.

  3. Operational Tests Pre-Operation checks (launched by Beam Sequencer) • During Operation(DiaMon application) fault diagnosis and monitoring configuration verification and integrity check • Post-Operation checks (included in PM ) response analysis

  4. Automated Test of CIBU connections (1/2) BIS design allows100% Online test coverage: Connections could be tested from end-to end • recovered “good as new” • But only from the input connectors... • In order to avoid blind failure, the User_Permit signal changes must be regularly checked ðAutomated Tests

  5. Automated Test of CIBU connections (2/2) ● Already available with only: ♦ BLM and BTV systems ♦ PIC, WIC and FMCM ● Required for: ♦ Collimation (Environmental parameters) ♦ Collimation (Motor positions) ♦ Vacuum ♦ Experiments (detector parts) ♦ Experimental Magnets … ● FESA property (for VME based system) and PVSS framework (for PLC based system) are both available MI team is willing to help but it’s up to the User System team to implement the functionality and write the code.

  6. Safe Beam Flag and Unmasking.... It has been foreseen to force the Safe Beam Flag to FALSE before the ramp… FALSE YES As an additional safety level, what about the “removal” of the masks? (could be implemented without difficulty)

  7. Summary ● Stable HW system despite few availability issues: Not related to BIC boards; under investigation with help of BE/CO. will be only related to machine availability move of BIC in UJ56 already scheduled; for the other locations: we will follow R2E advices ● Radiation issues? ● Monitoring and Test SW in operation: - Pre-Operational checks recently integrated in LHC Beam Sequencer - Post-Operational checks are included in PM analysis - BIS Java application and Diamon application both give on-line diagnosis - CIBU Automated tests increase the level of confidence: To be done by the User System team Partially implemented; need MPP recommendation for (re)activating the “process” ● Masks removed before the ramp? Waiting for a decision...

  8. Spare slides Spare slides

  9. Key element of PM analysis Thanks to the different gathered History Buffers: - Identification of the beam dump source - Reconstruction to the sequence of events that has led to the beam dump

  10. CIBU Test Layout Simplified layout PVSS framework (supplied by EN/ICE)