1 / 41

Reconstruction Results of Z CMS for ME+2

Reconstruction Results of Z CMS for ME+2. Samir Guragain, Marcus Hohlmann Dept. of Physics and Space Sciences, Florida Institute of Technology, Melbourne, FL 32901 CMS Week December 2007 at CERN [EVO]. Outline. Plots for all ME+2 SLMs in Z CMS at B= 0 T & 4T SLM 2-5 in detail

Télécharger la présentation

Reconstruction Results of Z CMS for ME+2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reconstruction Results of ZCMS for ME+2 Samir Guragain, Marcus Hohlmann Dept. of Physics and Space Sciences, Florida Institute of Technology, Melbourne, FL 32901 CMS Week December 2007 at CERN [EVO]

  2. Outline • Plots for all ME+2 SLMs in ZCMS at B= 0 T & 4T SLM 2-5 in detail SLM 1-4 in detail SLM 3-6 in detail • A recent drawing (provided by D. Eartly) Implementation of data from the drawings into SDF • First version of ME+2 SLM 1-4 plot in Rphi is shown. Muon Alignment, CMS Week December 2007 - S. Guragain

  3. ME+2 SLM 2-5 in ZCMSwith 10 measurements at B=0T Note: Laser path straightened PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain

  4. Laser hits on CCDs ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  5. Laser hits & fitted points Muon Alignment, CMS Week December 2007 - S. Guragain

  6. CSC centers on ME+2 SLM 2-5 in ZCMS at B=0T 2_2_08 Back chamber NO PG 2_2_27 2_1_04 2_1_14 Muon Alignment, CMS Week December 2007 - S. Guragain

  7. Alignment Pins on ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  8. Top of the DCOPS on ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  9. ME+2 SLM 2-5 in ZCMSwith 7 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain

  10. ME+2 SLM 1-4 in ZCMSwith 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain

  11. Laser hits on CCDs ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  12. CSC centers on ME+2 SLM 1-4 in ZCMS at B=0T 2_2_20 2_2_03 Back chamber NO PG 2_1_10 2_1_02 Muon Alignment, CMS Week December 2007 - S. Guragain

  13. Alignment Pins on ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  14. Top of DCOPS on ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  15. ME+2 SLM 1-4 in ZCMSwith 10 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain

  16. Laser hits on CCDs ME+2 SLM 1-4 in ZCMS at B=4T B=4T Muon Alignment, CMS Week December 2007 - S. Guragain

  17. CSC centers on ME+2SLM 1-4 in ZCMS at B=0T & 4T ~ 6 mm ~ 14 mm Muon Alignment, CMS Week December 2007 - S. Guragain

  18. ME+2 SLM 3-6 in ZCMSwith 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain

  19. Laser hits on CCDs ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  20. CSC centers on ME+2 SLM 3-6 in ZCMS at B=0T 2_1_08 2_1_16 2_2_15 2_2_32 Back Chamber NO PG Muon Alignment, CMS Week December 2007 - S. Guragain

  21. Alignment Pins on ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  22. Top of DCOPS on ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain

  23. ME+2 SLM 3-6 in ZCMSwith 10 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain

  24. Laser hits on CCDs ME+2 SLM 3-6 in ZCMS at B=4T Muon Alignment, CMS Week December 2007 - S. Guragain

  25. CSC centers on ME+2SLM 3-6 in ZCMS at B=0T & 4T ~ 6.5 mm ~ 14.5 mm Muon Alignment, CMS Week December 2007 - S. Guragain

  26. Fit Residuals All SLMs of ME+2 Z resolution 68 micron Muon Alignment, CMS Week December 2007 - S. Guragain

  27. Fit Pulls • Currently hit errors are set to the larger of: • 17 micron • error on mean of laser profile from MINUIT Muon Alignment, CMS Week December 2007 - S. Guragain

  28. Discrepancies of top of DCOPS and CSCs against PG Muon Alignment, CMS Week December 2007 - S. Guragain

  29. Recent drawing Recent drawings are available on the following link: http://research.fit.edu/hep/FloridaTech_CMS_ME_Alignment_Page.htm By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain

  30. ME+2 SLM1-4 in Rphiwith ideal measurements Ideal Muon Alignment, CMS Week December 2007 - S. Guragain

  31. Laser hits on CCDs ME+2 SLM 1-4 in Rphi at ideal Ideal Muon Alignment, CMS Week December 2007 - S. Guragain

  32. ME+2 SLM 1-4 in Rphi with 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain

  33. Laser hits on CCDs ME+2 SLM 1-4 in Rphi at B=0T Oct 10, 2007 Muon Alignment, CMS Week December 2007 - S. Guragain

  34. Laser hits & fitted points Muon Alignment, CMS Week December 2007 - S. Guragain

  35. Summary • Reconstruction results of ME+2 SLMs in ZCMS are comparable to Photogrammetry (PG) data at 0T. Positions of top of the DCOPS, coded targets on the skin and alignment pins are compared with PG. • Resolution and sensitivity to relative changes 68 micron • Accuracy of CSCs and DCOPS 491 micron (against PG) • Drawings show the detail view of DCOPS dowel pins and alignment pins wrt CSC center. • Reconstruction in Rphi has started to work with correct geometry input. • Immediate Item to take care of Expand Rphi reconstruction to other SLMs. Muon Alignment, CMS Week December 2007 - S. Guragain

  36. Back up Slides Muon Alignment, CMS Week December 2007 - S. Guragain

  37. SLM Configurations:DCOPS Orientations IN IN IN IN OUT OUT OUT OUT IN IN 4 OUT OUT OUT OUT IN IN IN IN IN IN 5 OUT IN OUT OUT OUT IN IN IN IN IN 6 Muon Alignment, CMS Week December 2007 - S. Guragain

  38. Reminder: ME+2 SLM2-5 Muon Alignment, CMS Week December 2007 - S. Guragain

  39. Recent drawings By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain

  40. Recent drawings (cont’d) By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain

  41. Recent drawings (cont’d) By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain

More Related