Landfills

Landfills. Actual: Heavy Equipment – 8 sections Trenching & Excavation – 3 sections. Anticipated: 2 Modules 11 sections. Heavy Equipment.

temima
Télécharger la présentation

Landfills

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Landfills Actual: Heavy Equipment – 8 sections Trenching & Excavation – 3 sections Anticipated: 2 Modules 11 sections Content Creation Guidelines

  2. Heavy Equipment The following rules regarding heavy equipment operation, safety accessories, and maintenance have been established for the protection of all individuals.

  3. Heavy Equipment 1 Only persons trained, qualified and/or certified (as required) shall operate heavy equipment on Waste Management property.

  4. Heavy Equipment 2 Seatbelts must be worn when operating heavy equipment.

  5. Heavy Equipment 3 Safe operating rules including but not limited to restrictions on speed, not exceeding load limits and prohibition of riders must be followed.

  6. Heavy Equipment 4 A back-up alarm, fire extinguisher and a functioning strobe light are required safety accessories on all heavy equipment.

  7. Heavy Equipment 5 Contractor owned heavy equipment shall be included in a preventative maintenance program according to the manufactures instructions.

  8. Heavy Equipment 6 Operators shall inspect heavy equipment before operating and at the end of each shift and document the results.

  9. Heavy Equipment 7 Modified heavy equipment that does not comply with applicable ANSI standards and/or manufacture’s standards is prohibited.

  10. Heavy Equipment 8 Heavy equipment with safety related deficiencies shall not be operated until all safety related deficiencies have been corrected.

  11. Trenching/Excavation Welcome to Trenching and Excavation. The construction, servicing and/or maintenance of leachate collection systems, gas collection systems and drainage swales, to name a few, often involves working in or around trenches and/or excavations.

  12. Trenching/Excavation 1 Those not involved in the trenching or excavation operation must refrain from entering and maintain a safe distance from all trenches and excavations.

  13. Trenching/Excavation 1 I understand and agree that those not involved in the trenching or excavation operation must refrain from entering and maintain a safe distance from all trenches and excavations.

  14. Trenching/Excavation 2 Hazards commonly associated with trenching and excavation operations typically include but are not limited to: • Falls • Cave-ins • Hazardous atmospheres (including oxygen deficient atmospheres)

  15. Trenching/Excavation 2 Remember, landfill gas is heavier than air and will therefore migrate into low-lying areas such as trenches and excavations and will displace oxygen. When oxygen is displaced in this way, breathing becomes difficult or impossible.

  16. Trenching/Excavation 3 Only trained and qualified persons under the direction of a certified competent person are authorized to perform trenching/excavation activities at this Waste Management landfill facility.

  17. Trenching/Excavation 3 I understand that only trained and qualified persons under the direction of a certified competent person are authorized to perform trenching and/or excavation activities at this Waste Management landfill facility.