Humid air Out with heat. Central Energy Plant. UTC’s Central Energy Plant. Cooling Tower. CWR 80ºF. Chilled Water Return 50ºF. A/C Unit. Dry air In. EMCS 404. CWS 70ºF. Chilled Water Supply 40ºF. Q. Work. Campus Overview EMCS Customer M-D-A

terena
Télécharger la présentation

CWS 70ºF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Humid air Out with heat Central Energy Plant UTC’s Central Energy Plant Cooling Tower CWR 80ºF Chilled Water Return 50ºF A/C Unit Dry air In EMCS 404 CWS 70ºF Chilled Water Supply 40ºF Q Work

  2. Campus Overview EMCS Customer M-D-A --------------CEP------------- A/C Heating Temperature Control Loop Level Control Loop Cooling Tower Temperature Control Loop Humid air Out with heat Central Energy Plant Cooling Tower CWR 80ºF Chilled Water Return 50ºF A/C Unit Dry air In EMCS 404 CWS 70ºF Chilled Water Supply 40ºF Q Work

  3. Humid air Out with heat Central Energy Plant Cooling Tower CWR 80ºF Chilled Water Return 50ºF A/C Unit Dry air In EMCS 404 CWS 70ºF Chilled Water Supply 40ºF Q Work

  4. Chilled Water Return 50ºF Central Energy Plant EMCS 404 Chilled Water Supply 40ºF Q from bodies and lights and equipment AHU Air Handling Unit

  5. AHU Air Handling Unit Customer Temperature Control Chilled Water Return 50ºF Central Energy Plant EMCS 404 Chilled Water Supply 40ºF TCV 101 TT 101 Q from bodies and lights and equipment Action TC 101 Measurement Decision

  6. Central Energy Plant A/C Unit Cooling Water Return 80ºF Chilled Water Return 50ºF Chilled Water Supply 40ºF Cooling Water Supply 70ºF Work

  7. Water Heater HPHT Water Campus Return P.O.C. Fuel Air

  8. HPHT Water Temperature Control D TRC 107 HPHT Water TT 107 M TCV 107 Return A P.O.C. Fuel Air

  9. Humid air Out with heat Central Energy Plant Cooling Tower CWR 80ºF A/C Unit Dry air In CWS 70ºF

  10. CWS Temperature Control Humid air Out with heat Action TC 109 TCZ 109 Decision Central Energy Plant Cooling Tower CWR 80ºF A/C Unit TT 109 Dry air In CWS 70ºF Measurement

  11. Humid air Out with heat Central Energy Plant UTC’s Central Energy Plant Cooling Tower CWR 80ºF Chilled Water Return 50ºF A/C Unit Dry air In EMCS 404 CWS 70ºF Chilled Water Supply 40ºF Q Work