1 / 29

Right or Wrong this is how we did it!

New Lexington City Schools. 1:1 with iPads. Right or Wrong this is how we did it!. Tonya Sherburne Superintendent New Lexington City Schools nl_tsherburn@seovec.org. Tim Householder Technology Director New Lexington City Schools nl_thousehol@seovec.org. Bobby Dodd High School Principal

thanos
Télécharger la présentation

Right or Wrong this is how we did it!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Lexington City Schools 1:1 with iPads Right or Wrong this is how we did it! Tonya Sherburne Superintendent New Lexington City Schools nl_tsherburn@seovec.org Tim Householder Technology Director New Lexington City Schools nl_thousehol@seovec.org Bobby Dodd High School Principal New Lexington City Schools nl_rdodd@seovec.org

  2. New Lexington City Schools: • Rural district • We have 4 school buildings: New Lexington High School (1:1 with iPads) New Lexington Middle School New Lexington Elementary School Junction City Elementary School • 1950 students district wide • 80% Free and Reduced lunch according to E-Rate 61.53% Free and Reduced lunch • Small IT Department • Macintosh District • Close to 1000 iPads in the district

  3. Must Haves for a 1:1 or BYOD: • • A plan of attack • Talk, Visit, Plan, Talk, Talk, Talk.................. • • Everyone must be on board • If your administrators and teachers are not • willing to make this work it never will. • •Wireless / Network infrastructure • Have this in place before you start – because you will have to learn on the fly. • Patience • Staff & students must be patient when it comes to implementation & management of devices.

  4. NLHS iPad Program Time Line: Summer 2011 – Meeting with new Superintendent to discuses the state of Technology in the district. 2011-2012 – All NLCS staff members receive iPads. Early 2012 - Visited Defiance High School Teachers, Administrators, Board Member, and Parent. January 2012 – Pilot with 27 AP students – AP students take iPads home 4th nine weeks. Managed with Casper MDM. February – May 2012 – App Study

  5. NLHS iPad Program Time Line: February 6th 2012 – “So, This is My iPad” Chad Reynolds and Megan Finnegan PD for Teachers March 5th 2012 – “So, This is My iPad” Chad Reynolds and Megan Finnegan PD for teachers May 2012 – Installed 34 Meraki Access Points at the high school August 2012 – Set up iPads Set up 600 in one week. August 16th 2012 - Parent Meeting 1 August 20th 2012 – Parent Meeting 2

  6. NLHS iPad Program Time Line: August 21st 2012 (Open House) – Parent Meeting 3 August 27th - 30th 2012 - Handed out iPads to students. (Social Studies) December 17th-18th 2012 – Apple PD (Math, Science) February 11th-12th 2013 – Apple PD (English, History) February 25th-26th 2013 – Apple PD (Special Education, Creativity)

  7. What is next? • How are we going to collect the iPads? • Rethink and revise for next year. App Store ???? Technology Fund ???? Everyone Takes Them Home ???? • Electronic text books. In progress …… • Wipe out devices and get ready for next year.

  8. Parent Meetings • What is an iPad • How we were going to use the iPads • Cost of the iPads – Technology Fund $50 per year Accessories-less than $50 students are responsible for. Scholarships If they do not pay they can not take them home • Acceptable Use Policy • Questions they had. Four documents must be read and signed before an iPad is issued: • Acceptable Use Policy • AUP Acceptance page • iPad Loan Agreement • Technology Fund All documents are available on our website under high school: http://nlpanthers.org

  9. NLHS Current Stats 600 iPads total – 550 for students / staff. We purchased a three year lease for 600 iPads with Apple Care + and 6 days of PD from Apple. We also purchased Griffin Survivor Cases for each student. Current Stats: Technology Fund: 498 Current Students – Not counting Tri- County or Alpha. 476 - 96% Have paid either full $50, making payments, or scholarship. 20 - Sent back to Apple for repair. (2- software 18 – damaged) Note: 16 – Broken Screen – 90% Freshman – 12 Taken Out of Case 1 – Submerged in pond   1 - Parent Drove Over With Car 7 – iPads reported Stolen

  10. New Lexington City Schools & Apple Configurator

  11. Free from Apple Apple Configurator Mass configure and deploy iPads. Requirements: OS X 10.7.5 or later Prepare devices
• Configure multiple devices simultaneously
• Update devices to the latest version of iOS
• Create and restore a backup of settings and app data from one device to other devices
• Import apps into Apple Configurator and sync them to new devices
• Use the built-in editor to create and install iOS configuration profiles
• Enroll devices with your Mobile Device Management solution for remote management Supervise devices ( When supervised students can not connect to iTunes )
• Organize supervised devices into custom groups
• Automatically apply common configurations to supervised devices
• Quickly reapply a configuration to a supervised device and remove the previous user’s data
• Import apps into Apple Configurator and sync them to supervised devices
• Define and apply common or sequential names to all devices
• Restrict supervised devices from syncing with other computers The computer you use Configurator on - is the only computer you can use to manage.

  12. 1:1 Set Up – 600 iPads Using 3 Bretford sync trays (10 iPads each for a total of 30) and 1 MacBook with Apple Configurator – Using a “master image” I was able to setup 600 iPads in 1 week. I brought in students to put the cases on. They put 600 cases on in 3 days.

  13. System Manager • Cloud Based • 100% Free for any Network • No Maximum number of devices • Operates over SSL • Works on any vendor’s network • Email support – Phone support for Meraki Customers

  14. Deployment

  15. Profiles

  16. Settings

  17. iOS apps

  18. The Good and Bad.. The Good Apple Configurator • The cost – Free • Once figured out – it is easy to use • Wiping out devices is quick and easy. Meraki System Manager • The cost – Free • Easy to use • Cloud based – no equipment The Bad Apple Configurator You have to touch every device. Meraki System Manager • App Store • Sometimes we have problems with profiles communicating. • Locating Devices. – Based on Service Provider / ip location. Meraki says that they are about to release something similar to Find my iPad (iCloud) • Profile can be removed

  19. New Lexington City Schools & Cloud Managed Wireless 802.11n Wireless LAN

  20. Why did we choose Meraki ?? • We had no managed Wi-Fi in the district. (Several Apple Airports). • We were going to a grade 9-12 - 1:1 solution with iPads and needed a more robust wireless solution. • After looking at several vendors and talking with our ITC we thought price wise the Meraki was the best fit for us. • Because our ITC agreed to purchase the Meraki Access Points in bulk (offering all of their schools Meraki APs) they could drive the price down. • The #1 reason - the free MDM solution Meraki offers.

  21. Centralized Management • 100% Cloud Managed • Built for rapid building wide deployments • Simple centralized management, no training required • Wireless APs serve 100+ users each • No user limitations

  22. User Visibility • Control over users, devices, and application • Control Bandwidth • Locate clients • View auto-generated reports

  23. Intelligence: • Auto-Configuring mesh network • Multi-channel routing protocols • Self-healing networking with per-flow optimization

  24. Security & Role Bases Access: • Layer 7 traffic classification and control • Intrusion detection engine • Identity-based content filtering. • Device-aware firewall rules

  25. Ease of Deployment I hired North West Regional Systems out of Mansfield. They brought two people and we had the 33 APs installed and online in 2 school days. Literally took them out of the box and connected them to POE switches. I played with the Dashboard for a couple hours and had them all configured. Now I just tweak as needed. Now - if we add new APs we just plug them in and add them to our dashboard and we are finished. Currently we have: 3 SSIDs: Staff Students Guest (this is on a timer – we do not allow during the school day).

  26. Wireless Project Cost $625 per/AP/year for a 5 year license. 2 - HP 2520 24 Port POE Switches $2700 1 - 8 Port POE Switch $150 AP installation (North West Regional Systems) $2200 Totals: Year 1 $9175 (1 Year License Fee, APs, Switches, and Installation) Yearly License Fee: $4125 Original set up: New Lexington High School (33 MR16, 1 MR66) Additional APs this year New Lexington High School (35 MR16, 1 MR66) New Lexington Middle School (24 MR16)

  27. Thank You! Tonya Sherburne Superintendent New Lexington City Schools nl_tsherburn@seovec.org Tim Householder Technology Director New Lexington City Schools nl_thousehol@seovec.org Bobby Dodd High School Principal New Lexington City Schools nl_rdodd@seovec.org www.nlpanthers.org

More Related