1 / 11

09M4417 Internal Kick Off

09M4417 Internal Kick Off. 09M4417 Neste Oil Singapore Internal Kick Off 16-04-2009. 09M4417 Internal Kick Off. Agenda: Kort introduktion Hvem er kunden, etc. Hvad og hvornår skal vi levere Projekt Teamet Projekt Planen Eventuelle Risk og kritiske punkter Hvad gør vi nu Evt.

thelma
Télécharger la présentation

09M4417 Internal Kick Off

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 09M4417 Internal Kick Off 09M4417 Neste Oil Singapore Internal Kick Off 16-04-2009 16-04-2009

  2. 09M4417 Internal Kick Off • Agenda: • Kort introduktion • Hvem er kunden, etc. • Hvad og hvornår skal vi levere • Projekt Teamet • Projekt Planen • Eventuelle Risk og kritiske punkter • Hvad gør vi nu • Evt. 16-04-2009

  3. 09M4417 Internal Kick Off Kunden: Clienten er Technip i Rom (Italien) End user er Neste Oil Singapore Planten: Skal producere Bio Fuel (Bio Diesel) Planten Startes op i slutningen af 2010 16-04-2009

  4. 09M4417 Internal Kick Off 16-04-2009

  5. 09M4417 Internal Kick Off Hvad skal vi levere: • Tre kabinetter (Rising, Marshalling, System) • Fire VC-6000 Rack • To Power Supply Rack • Switch, PC og Printer • Transportabel Data Collector incl. SW • Dokumentation • BKV standard 16-04-2009

  6. 09M4417 Internal Kick Off Ordre sum og Payments: • Main ordre: 118.552,00 Euro (Rising, Marshalling, System) • 1st Payment: 10% at PO and Initial Drawings • 2nd Payment: 70% at delivery of HW • 3rd Payment: 10% at delivery of Fianal Data Book • 4th Payment: 10% at end of Warranty period • Transportabel Data Collector incl. SW: 26.402,00 Euro • Agent shall have 5% 16-04-2009

  7. Project Teamet: 09M4417 Internal Kick Off 16-04-2009

  8. 09M4417 Internal Kick Off Milestone plan: 24-04-2009: Loop Diagrams Approved by Technip 20-05-2009: First Submittal of Drawings 15-06-2009: Preliminar Design Review with Technip 20-06-2009: Second Submittal of Drawings 29-06-2009: Critical Design Review (CDR) Held with Technip 29-06-2009: All parts in house 29-07-2009: Cabinets finalised and ready for Pre-FAT 19-08-2009: Submittal of Vendor Data Book (VDR) 28-08-2009: Pre-FAT finalised and ready for FAT 10-09-2009: FAT finalised and Approved by Technip (100%) 17-09-2009: Shipment of Cabinets (EXW) 02-10-2009: Submittal of Final Vendor Data Book (VDR) 16-04-2009

  9. 09M4417 Internal Kick Off Risk og Kritiske punkter • Meget presset tidsplan • Technip har lange respons tider • Ressourcer til VC-6000 Setup og Modbus • Ressourcer fra Service til Pre-FAT og FAT (CMM roll out) • VC-6000 modul leverance fra Darmstadt (lang leveringstid) • LS ressourcer (Projekt Teamet, andre opgaver, etc.) • Eksterne ressourcer (El-KAS) • Test området (andre projekter) 16-04-2009

  10. 09M4417 Internal Kick Off Hvad gør vi nu: • Afklaring System Setup • Opstart af System Tegninger • Opstart af Loop Tegninger • Functional Design Specification (FDS) • Input til XAL • Opstart af SMDR 16-04-2009

  11. 09M4417 Internal Kick Off Evt.: 16-04-2009

More Related